Change Consultations
List of Change Consultations
P404 ‘Moving the SAD to a Category 3 BSC Configurable Item’Read More
P404 aims to move Balancing and Settlement Code Procedure BSCP537 Appendices 1 ‘Self Assessment Document’, 2 ‘Testing Requirements’ and 3 ‘Guidance Notes on completing the SAD’ to a new Category 3 BSC Configurable Item.
This will facilitate quicker change to the Self Assessment Document (SAD) and its supporting documentation, with the new Category 3 BSC Configurable Item being owned and managed by the Performance Assurance Board (PAB).
P403: BSC Arrangements in the event that the TERRE Market is suspended by National Grid ESORead More
This Modification will change the Balancing and Settlement Code (BSC) to align with the existing Grid Code Trans European Replacement Reserves Exchange (TERRE) market suspension arrangements and support National Grid Electricity System Operator’s (NGESO) Market Suspension Rules proposal; mandated by the European regulations ‘Network Code on Electricity Emergency and Restoration’ (NCER) and ‘Establishing a guideline on electricity transmission system operation (SOGL). P403 will provide Market Participants clarity on how the BSC arrangements will operate in the event that the TERRE Market arrangements are suspended
P392 Assessment Procedure ConsultationRead More
This Modification will ensure the process and responsibilities for amending BSC provisions constituting EBGL Article 18 terms and conditions reflect delegations made by NGESO in favor of the BSCCo and BSC Panel, to ensure a unified market change process. These changes are necessary to ensure the EBGL change process is followed as part of the existing BSC Change process, for all future BSC Modifications that impact the EBGL Article 18 terms and conditions found in the BSC.
P401 Report Phase ConsultationRead More
P401 looks to clarify the governance arrangements for BSC Panel Alternates in respect of their contribution to quoracy and voting at BSC Panel meetings. This will help to address ambiguity within the existing arrangements.
This consultation allows you to have your say regarding the proposed changes.
P400 Report Phase ConsultationRead More
This consultation is in regards to allowing the BSC Panel to make decisions on Modifications Business via tele/video conference.
Currently, paragraph 4.4.7 of BSC Section B explicitly prevents the Panel from conducting Modification Business by tele/video conference except in the case of Urgent Modification Proposals. This is overly restrictive and could, in the event that a quorum of Panel Members or their Alternates cannot physically attend a Panel meeting, could delay or halt the progression of BSC Change.
This consultation allows you to have your say regarding the proposed changes.