The Issue 29 group held its second meeting on 16 November 2007. Further to the previous discussions the group agreed that a Modification of the Code would be necessary. Furthermore, the group identified some changes to the Straw Man Model that would be required. The main changes can be summarised as follows:
- The PrA will specify the sampling requirement and Elexon will define the requirement from each Supplier;
- There will be a new PrA MPID but this will be owned by the PrA Agents rather than Elexon;
- The Supplier will have the choice of providing the required sample data itself or can appoint the PrA’s Agents to arrange collection of the data;
- There will be a generic contract set up between the Suppliers, the PrA and its Agents;
- The Supplier will remain responsible for the performance of the PrA Agents; and
- Defined action to be taken to be the PrA on Change of Supplier and Change of Tenant.
It is envisaged that an issue group member will raise the defined Modification.