This page lists all Consultations relating to BSC and code processes, Market Entry and Compliance, and Operations and Settlement. The consultations allow ELEXON to gather feedback from the industry about proposed changes so that any concerns are considered as part of our processes.

This list does not include Change Consultations.

(Showing items 111-120 of 256)

Show 10 | 20 | 50 | All
View Credit Assessment Price (CAP) consultation: 21 December 2020

Credit Assessment Price (CAP) consultation: 21 December 2020Read More

We invite Parties to indicate whether they agree with the proposal to increase the value of CAP to £60/MWh from last notified value of £56/MWh.

As the trigger level is set at 10% of the CAP value, rounded to the nearest whole pound, this would remain at  +/-£6/MWh.

View Code Change and Development Group consultation on MHH Settlement

Code Change and Development Group consultation on MHH SettlementRead More

This CCDG consultation is your chance to have your say on the essential data items, processes and Code changes needed to deliver the MHH Settlement Target Operating Model (TOM). You can find out what the consultation is about, watch a guidance video about the consultation and download the relevant documents to complete. 

View Metering Dispensations D505 Consultation

Metering Dispensations D505 ConsultationRead More

This is a public industry consultation on Metering Dispensation D505. We seek views from BSC Parties expressing their views or providing any further evidence on any of the matters contained within the consultation on D505.

View Credit Assessment Price (CAP) consultation: 7 September 2020

Credit Assessment Price (CAP) consultation: 7 September 2020Read More

We have issued a consultation paper on the value of Credit Assessment Price (CAP).  We invite Parties to indicate whether they agree with the proposal to increase the value of CAP to £56/MWh from last notified value of £46/MWh.

View Consultation on the Market Index Definition Statement Review 2020

Consultation on the Market Index Definition Statement Review 2020Read More

Our yearly analysis suggests that there are no further changes to the MIDS required at this time, with the current Individual Liquidity Threshold (ILT), timeband weightings and product weightings remaining suitable.

View Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group – 4 September 2020

Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group – 4 September 2020Read More

Scottish Hydro Electric Transmission plc (SHE-T) is connecting a new circuit to the Rothienorman 33kV substation, required as part of the East Coast 400 kV Reinforcement project. This new Systems Connection Point will be registered in Settlement as a new GSP, to be known as Rothienorman (ROTI3).

The National Electricity Transmission System Operator (NETSO) propose that GSP_ ROTI3 is allocated to the North Scotland (_P) GSP Group.

Responses

If you have any views on the allocation of the above GSP to the North Scotland GSP Group, please respond using the consultation response form, and send to [email protected] by 17:00 on 18 September 2020.

View P350 draft reference network mapping statement for Reference Year 2019-20

P350 draft reference network mapping statement for Reference Year 2019-20Read More

We issued a consultation on the draft reference network mapping statement for Modification P350 ‘Introduction of a seasonal Zonal Transmission Losses scheme’ to each Party. The network mapping statement is used for determining Nodal power flows in the calculation of Transmission Loss Factors. 

Response

Please respond using the consultation response form and send your responses, entitled  ‘P350 Draft Reference Network Mapping Statement’, to [email protected]  by 17.00 on Monday 14 September 2020.

View Credit Assessment Price (CAP) consultation: 10 August

Credit Assessment Price (CAP) consultation: 10 AugustRead More

We are consulting on an increase of the CAP to £46/MWh from the current CAP value of £36/MWh. A change to CAP can impact the amount of Credit Cover required by a Trading Party.

View Credit Assessment Price (CAP) consultation: 6 July 2020

Credit Assessment Price (CAP) consultation: 6 July 2020Read More

The Credit Assessment Price (CAP) is used in the Energy Indebtedness calculations to convert Credit Cover into an energy value. 

View Issue 89 Request for Information

Issue 89 Request for InformationRead More

The BSC Panel has asked Elexon to provide analysis on the cost and effort related to the DCE that occurred on 9 August 2019 (DCE00201). We are looking specifically at those costs incurred by parties, both direct and indirect, associated with the SAP that are required to be carried out to ensure Settlement is accurately calculated for the Settlement Periods impacted by the DCE. This analysis is being carried out for Issue 89 and P397.

The provision of this information is critical to meet the aim of Issue 89, to ensure the SAP is fit for purpose, and the aim for P397, to only run the SAP when the benefits outweigh the costs. Moreover, the provision of this information is needed to meet the Ofgem request in relation to P397. Your help and support in this matter is appreciated.