This page lists all Consultations relating to Operations and Settlement. The consultations allow the team to gather feedback from the industry about proposed changes so that any concerns are considered as part of our processes.
Credit Assessment Price (CAP Review) process consultation: 13 January 2020Read More
The Credit Assessment Price (CAP) is used in the Energy Indebtedness calculations to convert Credit Cover into an energy value. We are consulting on a decrease of the CAP to £41/MWh from the last notified value of £47/MWh. A change to CAP can impact the amount of Credit Cover required by a Trading Party.
If all respondents and Credit Committee members are in agreement, the proposed value will be implemented on Wednesday 12 February 2020 and the trigger level will remain the same.
If at least one respondent or Credit Committee member requests it or disagrees with the proposed value, Elexon will arrange a Credit Committee meeting. The Credit Committee will determine if a change needs to be made to the value of the CAP, the trigger level and when any new value should be implemented.
Outcome
No responses were in disagreement with the new suggested CAP value. As such, no Credit Committee meeting was held and the proposed CAP value was implemented on the date stated in the consultation.
Credit Assessment Price (CAP) review consultation: 16 December 2019Read More
This consultation seeks respondents’ views on decreasing the CAP to £47/MWh from the last notified value of £54/MWh.
This change can affect the level of Credit Cover that you are required to lodge, so we encourage you to respond to the consultation.
If at least one respondent or Credit Committee member requests it, Elexon will arrange a Credit Committee meeting after the consultation closes to determine the new CAP value.
Outcome
No responses were in disagreement with the new suggested CAP value. As such, no Credit Committee meeting was held and the proposed CAP value was implemented on the date stated in the consultation.
Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group – 30 October 2019Read More
Elexon has received a new GSP registration application from the National Electricity Transmission System Operator. UK Power Networks are connecting two new circuits into the Richborough 132kV substation.
Consultation on the Market Index Definition Statement Review 2019Read More
The Market Index Definition Statement (MIDS) defines the use of Market Index Data to calculate the Market Index Price (MIP), a price reflective of wholesale electricity for a Settlement Period in the short term market. An annual review of this document is required by the BSC, to ensure that the MIP is providing a reasonable reflection of the price of wholesale electricity in the short term market.
Changes were made to the MIDS as part of BSC Modification P377 ‘Amending Gate Closure references in Market Index Data’, which was implemented on 18 April 2019.
Our yearly analysis suggests that there are no further changes to the MIDS required at this time, with the current Individual Liquidity Threshold (ILT), timeband weightings and product weightings remaining suitable.
Response
Please respond using the consultation response proforma and send your responses, entitled ‘MIDS Review 2019 Consultation’, to [email protected] by Thursday 10 October 2019.
Responses to this consultation will be considered by the Imbalance Settlement Group at its meeting on 22 October 2019, where a final recommendation will be made to the BSC Panel for approval.
Credit Assessment Price (CAP) consultation: 9 September 2019Read More
This consultation seeks respondents’ views on increasing the CAP £54/MWh from the last notified value of £43/MWh.
Outcome
No responses were in disagreement with the new suggested CAP value. As such, no Credit Committee meeting was held and the proposed CAP value was implemented on the date stated in the consultation.
P350 draft reference network mapping statement for Reference Year 2018-19Read More
We issued a consultation on the draft reference network mapping statement for Modification P350 ‘Introduction of a seasonal Zonal Transmission Losses scheme’ to each Party. The network mapping statement is used for determining Nodal power flows in the calculation of Transmission Loss Factors.
Response
Please respond using the consultation response form and send your responses, entitled ‘P350 Draft Reference Network Mapping Statement’, to [email protected] by 17.00 on Friday 13 September 2019.
Changes to the CAP Review Process: 12 August 2019Read More
We invite Trading Parties to indicate whether they agree with the proposal to set new CAP values based on the estimated reference price on the implementation date of the new CAP. We also invite Parties to indicate if they agree the trigger level (the value from which if the reference price deviates by, then a review of the CAP is triggered) should be automatically set. These proposed changes will allow for a more efficient process whilst maintaining the necessary levels of control.
Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group 21 June 2019Read More
Elexon has received a new GSP registration application from the Transmission Company. National Grid Electricity Transmission (NGET) is connecting a new GSP at Islington.
P350: Methodology for Load Periods and Sample Settlement Periods Consultation 19 June 2019Read More
Modification P350 ‘Introduction of a seasonal Zonal Transmission Losses scheme’ introduced a Transmission Loss Factor (TLF) for each TLF Zone and BSC Season, so transmission losses can be allocated on a geographical basis. P350 went live on 1 April 2018.
This Consultation details the proposed methodology for setting Load Periods and Sample Settlement Periods to be used in the derivation of Zonal TLFs, as required by the Balancing and Settlement Code (BSC).
Outcome
No responses were in disagreement with using the suggest methodology to calculate the Load Periods (LPs) and Sample Settlement Periods (SSPs). The methodology, and the new LPs and SSPs for BSC Year 2020/21, were presented to the Imbalance Settlement Group (ISG) in July 2019. These were approved by the ISG and were published on the TLF Determination page of the Elexon Portal.
Credit Assessment Price (CAP) consultation: 10 June 2019Read More
This consultation seeks respondents’ views on decreasing the CAP £41/MWh from the last notified value of £48/MWh.
Response
Please email responses to [email protected] using the pro-forma below by 17:00 on Tuesday 18 June 2019.
DWG’s consultation on transitioning to Market-wide Half Hourly SettlementRead More
The DWG has developed its approach for transitioning from the current Settlement arrangements to the Target Operating Model (TOM) for Market-wide Half Hourly Settlement (MHHS).
This consultation is your opportunity to comment on the transition approach as developed by the DWG, before Ofgem makes the final decision whether to approve it.
MHHS is a fundamental reform that will affect both existing and future participants in the energy market. The DWG therefore encourages views from all stakeholders.
Responses
Please email responses to [email protected] using the response form by 08:00 on 8 July 2019.
Further information
You can find more information about the DWG on the Design Working Group page of our website.
Credit Assessment Price consultation: 4 March 2019Read More
Following a decrease in forward market prices, a Credit Assessment Price (CAP) review was triggered. We have issued a consultation paper on the value of the Credit Assessment Price.
We propose to decrease the value of CAP to £49/MWh from the last notified CAP value of £56/MWh.
DWG’s preferred TOM for Market-wide Half Hourly Settlement consultationRead More
This consultation seeks views on the Target Operating Model (TOM) developed by the Design Working Group (DWG), before Ofgem makes the final decision on whether to approve it. Market-wide Half Hourly Settlement (MHHS) is a fundamental reform which will impact both existing and future participants in the energy market. The DWG therefore encourages views from all stakeholders.
Credit Assessment Price (CAP) consultation: 4 February 2019Read More
This consultation seeks respondents’ views on decreasing the CAP to £56/MWh from the last agreed value of £68/MWh.
Elexon has produced a set of data visualisation graphs that show the reference CAP and the live CAP and are used by Elexon to support the regular CAP Review process.
- More on data graphs and calculating new CAP values
Response
Please email responses to [email protected] using the pro-forma below by 17:00 Tuesday 12 February 2019.
Credit Assessment Price Consultation 5 November 2018Read More
We have issued a consultation paper on the value of Credit Assessment Price (CAP) . We invite Trading Parties to indicate whether they agree with the proposal to decrease the value of CAP to £68/MWh from its current approved level of £75/MWh.
Responses
You are invited to respond to this consultation using the consultation proforma. Please email your responses to [email protected] by 17:00 on Tuesday 13 November 2018.
Consultation on reducing CADL and DMAT parameters in 2018Read More
We issued a consultation on the value of the pricing parameters De Minimis Acceptance Threshold (DMAT) and Continuous Acceptance Duration Limit (CADL). These parameters are used to classify and remove actions as part of the Imbalance Price Calculation.
We are proposing reducing CADL from 15 minute to 10 minutes and reducing DMAT from 1MWh to 0.1MWh.
- Elexon Insights: What’s the impact of changing DMAT and CADL?
Responses
If you have any views on views on the CADL and DMAT review, please respond using the consultation response form and send your responses, entitled “CADL / DMAT Review 2018”, to [email protected] by 17:00 on Friday 9 November 2018.
Consultation on how to align BSC reporting with EMR RegulationsRead More
The Schedule of EMR Settlement Data (which was agreed by Elexon, LCCC, ESC and EMRS in 2015) specifies that EMRS will be provided with a BM Unit Gross Demand Report, containing the gross demand data that EMRS requires in order to calculate the payments due from each licensed Supplier.
But, since then, Elexon has become aware of two evolutions:
- In July 2017, BEIS and Ofgem published their joint Smart Systems and Flexibility Plan. This plan makes clear that BEIS and Ofgem now interpret the definition of ‘supply’ in the Electricity Act as meaning that the Supplier Obligation is not payable in relation to supply to premises occupied by a generator licence holder for the purpose of carrying out activities authorised under the generation licence, even if the generation is not ‘Licensable’.
- Elexon has been approached by parties seeking to facilitate exempt supply (by the operators of community generation assets to local customers) under the class A supply licence exemption. Because this supply is not being made by a licensed Supplier it should not be subject to EMR charges, but currently the BM Unit Gross Demand Report sent to EMRS includes these volumes in the gross demand for the licensed Supplier who has registered metering on behalf of the exempt supplier.
The consultation document seeks views on how we should progress interim and enduring solutions to these issues. The BSC Panel will consider responses to the consultation at their meeting on 8 November 2018.
MIDS Review 2018 ConsultationRead More
The Market Index Definition Statement (MIDS) defines the use of Market Index Data to calculate the Market Index Price (MIP), a price reflective of wholesale electricity for a Settlement Period in the short term market. An annual review of this document is required by the BSC, to ensure that the MIP is providing a reasonable reflection of the price of wholesale electricity in the short term market.
Changes to the MIDS timeband descriptions are recommended following BSC Modification P342, which decoupled the Submission Deadline for Energy Contract Volume Notifications (ECVNs) and Metered Volume Reallocation Notifications (MVRNs) from Gate Closure. BSC Modification P342 was implemented in November 2017.
Response
Please respond using the consultation response form and send your responses, entitled ‘MIDS Review 2018 Consultation’ , to [email protected] by 17.00 on Monday 22 October 2018.
P350 draft reference network mapping statement for Reference Year 2017-18Read More
We issued a consultation on the draft reference network mapping statement for Modification P350 ‘Introduction of a seasonal Zonal Transmission Losses scheme’ to each Party. The network mapping statement is used for determining Nodal power flows in the calculation of Transmission Loss Factors.
Response
Please respond using the consultation response form and send your responses, entitled ‘P350 Draft Reference Network Mapping Statement’, to [email protected] by 17.00 on Friday 14 September 2018.
Consultation for allocation of a new GSP to a GSP GroupRead More
Elexon has received a new GSP registration application from the Transmission Company.
Southern Electric Power Distribution (SEPD) is connecting two new circuits into the existing East Claydon 132kV substation. This new Systems Connection Point will be registered in Settlement as a new GSP, to be known as East Claydon – Southern GSP (ECLA_H).
The Transmission Company propose that GSP ECLA_H is allocated to the Southern (_H) GSP Group.
A diagram showing the proposed change is included in the consultation document.
Responses
If you have any views on the allocation of the above GSPs to GSP Groups, please respond using the consultation response form and send your responses, entitled “East Claydon – Southern GSP Consultation”, to [email protected] by 17:00 on Tuesday 11 September 2018.