List of all BSC Modifications

(Showing items 141-160 of 485)

Show 10 | 20 | 50 | 100 | All

P345 – Reducing the CAP change notice period and improving its flexibility

Reducing the CAP change notice period and improving its flexibility
Read More

P344 ‘Wider Access & Project TERRE’

‘Project TERRE implementation into GB market arrangements’
Read More

P343 – Increase to the number of Supplier IDs that can be held by a Supplier

Increase to the number of Supplier IDs that can be held by a Supplier
Read More

P342 – Change to Gate Closure for Energy Contract Volume Notifications

Change to Gate Closure for Energy Contract Volume Notifications
Read More

P341 – Forward Publication of Maximum Export and Import Limits

Forward Publication of Maximum Export and Import Limits
Read More

P340 – Removal of References and Requirements Relating to the LCPD

Removal of References and Requirements Relating to the LCPD
Read More

P339 – Introduction of new Consumption Component Classes for Measurement Classes E-G

Introduction of new Consumption Component Classes for Measurement Classes E-G
Read More

P338 – Consequential changes to P272 legal text

Consequential changes to P272 legal text
Read More

P337 – Extension to the payment timescales for Quarter Date Advice Notes below the Advice Note Threshold Limit

Extension to the payment timescales for Quarter Date Advice Notes below the Advice Note Threshold Limit
Read More

P336 – Fuel types on the BMRS

Fuel types on the BMRS
Read More

P335 – Inclusion of Non-BM STOR costs and volumes in the indicative cashout price

Inclusion of Non-BM STOR costs and volumes in the indicative cashout price
Read More

P334 – Inclusion of Non-BM STOR costs and volumes into the cashout price in time for publication after the end of the Settlement Period

Inclusion of Non-BM STOR costs and volumes into the cashout price in time for publication after the end of the Settlement Period
Read More

P333 – Inclusion of DSBR volumes into the cashout price in time for publication after the end of the Settlement Period

Inclusion of DSBR volumes into the cashout price in time for publication after the end of the Settlement Period
Read More

P332 ‘Revisions to the Supplier Hub Principle’

Revisions to the Supplier Hub Principle
Read More

P331 – Extended Dispute Deadline at the Post-Final Settlement Run under exceptional circumstances

Extended Dispute Deadline at the Post-Final Settlement Run under exceptional circumstances
Read More

P330 – Allowing Elexon to tender for the Uniform Network Code Gas Performance Assurance Framework Administrator (PAFA) role

Allowing Elexon to tender for the Uniform Network Code Gas Performance Assurance Framework Administrator (PAFA) role
Read More

P329 – Changes to REMIT inside information reporting

Changes to REMIT inside information reporting
Read More

P328 – Clarifying BSC SBR definitions to align with the BSAD and SMAF Methodology Statements

Clarifying BSC SBR definitions to align with the BSAD and SMAF Methodology Statements
Read More

P327 – Clarifications to P305 legal text

Clarifications to P305 legal text
Read More

P326 – Introduction of a non-Working Day adjustment to the Credit Cover Percentage calculation

Introduction of a non-Working Day adjustment to the Credit Cover Percentage calculation
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.