Glossary
List of all BSC Modifications
P285 – Revised treatment of RCRC for Interconnector BM Units
Revised treatment of RCRC for Interconnector BM Units
P284 – Expansion of Elexon’s role via the ‘contract model’
Expansion of Elexon’s role via the ‘contract model’
P283 – Reinforcing the Commissioning of Metering Equipment Processes
Reinforcing the Commissioning of Metering Equipment Processes
P282 – Allow MVRNs from Production to Consumption or Vice Versa
Allow MVRNs from Production to Consumption or Vice Versa
P281 Change of BSCCo Board of Directors & Chairman
Change of BSCCo Board of Directors & Chairman
P280 Introduction of new Measurement Classes
Introduction of new Measurement Classes
P279 Correcting the BSC description of the CDCA to SVAA interface for GSP Group net Export
Correcting the BSC description of the CDCA to SVAA interface for GSP Group net Export
P278 Treatment of Transmission Losses for Interconnector Users
Treatment of Transmission Losses for Interconnector Users
P277 Allow Interconnector BM Units to choose their P/C Status
Allow Interconnector BM Units to choose their P/C Status
P276 Introduce an additional trigger/threshold for suspending the market in the event of a Partial Shutdown
Introduce an additional trigger/threshold for suspending the market in the event of a Partial Shutdown
P275 Extending BSC Performance Assurance
Extending BSC Performance Assurance
P274 Cessation of Compensatory Adjustments
Cessation of Compensatory Adjustments
P273 Make the SVA Funding Share Calculation robust to changes in Scaling Weights
Make the SVA Funding Share Calculation robust to changes in Scaling Weights
P272 Mandatory Half Hourly Settlement for Profile Classes 5-8
Mandatory Half Hourly Settlement for Profile Classes 5-8
P271 NETSO Consultation in relation to any potential changes to the BSC which takes place in forums other than the BSC Panel
NETSO Consultation in relation to any potential changes to the BSC which takes place in forums other than the BSC Panel
P270 The Application of Line Loss Factors to GSPs that are not Transmission-interconnected
The Application of Line Loss Factors to GSPs that are not Transmission-interconnected
P269 Prevention of Base Trading Unit BMUs’ Account Status Flipping from Consumption to Production (the “Flipping” mod)
Prevention of Base Trading Unit BMUs’ Account Status Flipping from Consumption to Production (the “Flipping” mod)
P268 Clarify the P/C status process for exempt BM Units
Clarify the P/C status process for exempt BM Units
P267 Consideration of wider industry developments and duration of proposed changes when agreeing progression timetables
Consideration of wider industry developments and duration of proposed changes when agreeing progression timetables
P266 Improving the allocation of Reactive Power flows between Import and Export Metering Systems
Improving the allocation of Reactive Power flows between Import and Export Metering Systems
P265 Improving the Accuracy of the Credit Calculation (P253 Alternative solution)
Improving the Accuracy of the Credit Calculation (P253 Alternative solution)
P264 Two-thirds majority requirement for Panel recommendations on licence originated Modifications
Two-thirds majority requirement for Panel recommendations on licence originated Modifications
P263 Code Governance Review: Send Back Process and Environmental Assessment
Code Governance Review: Send Back Process and Environmental Assessment
P262 Code Governance Review: Significant Code Reviews, Self Governance and Code Administration Code of Practice
Code Governance Review: Significant Code Reviews, Self Governance and Code Administration Code of Practice
P261 Correcting an omission in the BSC arising from the P216 Alternative Modification legal text
Correcting an omission in the BSC arising from the P216 Alternative Modification legal text
P260 Extension to data provided to the Transmission Company in the TUoS Report
Extension to data provided to the Transmission Company in the TUoS Report
P259 Provision of Applicable Balancing Service Volumes for Interconnectors
Provision of Applicable Balancing Service Volumes for Interconnectors
P258 Including Party Agents in the Trading Disputes process
Including Party Agents in the Trading Disputes process
P257 Removal of the concept of Trading Queries
Removal of the concept of Trading Queries
P256 Improving efficiency and clarity of the Trading Disputes process
Improving efficiency and clarity of the Trading Disputes process
P255 Profile Administrator: creating flexibility in discharging the service
Profile Administrator: creating flexibility in discharging the service
P254 Removal of Main and SVA Specified Charge Amounts from the Code
Removal of Main and SVA Specified Charge Amounts from the Code
P253 Improving the accuracy of the credit calculation for SVA participants
Improving the accuracy of the credit calculation for SVA participants
P252 Removal of Trading Parties’ ability to submit two votes at elections of BSC Panel industry members
Removal of Trading Parties’ ability to submit two votes at elections of BSC Panel industry members
P251 Revision of the election process for BSC Panel Industry Members
Revision of the election process for BSC Panel Industry Members
P250 Prevention of ‘Timing Out’ of Authority decisions on Modification Proposals
Prevention of 'Timing Out' of Authority decisions on Modification Proposals
P249 Revision of banking arrangements under the BSC
Revision of banking arrangements under the BSC
P248 Aligning BSC interest calculation requirements with the FAA calculation method and P235 principles
Aligning BSC interest calculation requirements with the FAA calculation method and P235 principles
P247 Proposer ‘ownership’ of Modification Proposals
Proposer ‘ownership’ of Modification Proposals
P246 Reporting to LDSOs of Aggregated Metering Data for Embedded Networks
Reporting to LDSOs of Aggregated Metering Data for Embedded Networks
P245 Changes to Long Term vacant Sites Timescales
Changes to Long Term vacant Sites Timescales
P244 – Provision of BritNed flow data to the BMRS
Provision of BritNed flow data to the BMRS
P243 Publication of Generator Forward Availability by Fuel Type
Publication of Generator Forward Availability by Fuel Type
P242 Treatment of Exemptable Generation Connected to Embedded Offshore Transmission Networks
Treatment of Exemptable Generation Connected to Embedded Offshore Transmission Networks
P241 Relaxation of Requirement to Separately Meter Licensable Generating Units
Relaxation of Requirement to Separately Meter Licensable Generating Units
P240 Switching Plant and Apparatus between BM Units
Switching Plant and Apparatus between BM Units
P239 Correcting Manifest Errors and Modifying an Interface in the P217 Legal Text
Correcting Manifest Errors and Modifying an Interface in the P217 Legal Text
P238 Removal of the requirement to Meter each Boundary Point for Offshore Power Park Modules
Removal of the requirement to Meter each Boundary Point for Offshore Power Park Modules
P237 Standard BM Unit Configuration for Offshore Power Park Modules
Standard BM Unit Configuration for Offshore Power Park Modules
P236 Compensation Claims for Metered Volume Reallocation Notification (MVRN) Parties arising from an Outage
Compensation Claims for Metered Volume Reallocation Notification (MVRN) Parties arising from an Outage