Glossary
List of all BSC Modifications
P205 – Increase in PAR level from 100MWh to 500MWh
Increase in PAR level from 100MWh to 500MWh
P204 – Scaled Zonal Transmission Losses
Scaled Zonal Transmission Losses
P203 – Introduction of a seasonal Zonal Transmission Losses scheme
Introduction of a seasonal Zonal Transmission Losses scheme
P202 – Energy Imbalance Incentive Band
Energy Imbalance Incentive Band
P201 – Energy Imbalance Tolerance Band
Energy Imbalance Tolerance Band
P200 – Introduction of a Zonal Transmission Losses scheme with Transitional Scheme
Introduction of a Zonal Transmission Losses scheme with Transitional Scheme
P199 Quantification of Demand Control in the BSC as instructed under OC.6 (c),(d) & (e) of the Grid Code
Quantification of Demand Control in the BSC as instructed under OC.6 (c),(d) & (e) of the Grid Code
P198 – Introduction of a Zonal Transmission Losses scheme
Introduction of a Zonal Transmission Losses scheme
P197 SVA Qualification Processes Review
SVA Qualification Processes Review
P196 – Treatment of Long Term Vacant Sites in Settlements
Treatment of Long Term Vacant Sites in Settlements
P195 – Neutrality for CCGT BMUs Switching Between Gas and Distillate
Neutrality for CCGT BMUs Switching Between Gas and Distillate
P194 – Revised Derivation of the ‘Main’ Energy Imbalance Price
Revised Derivation of the 'Main' Energy Imbalance Price
P193 – Improved Arrangements for Modification Proposals raised by the BSC Panel
Improved Arrangements for Modification Proposals raised by the BSC Panel
P192 – Change of Name of the Transmission Company
Change of Name of the Transmission Company
P191 – Revised definition of Balancing Mechanism Unit to include Power Park Module
Revised definition of Balancing Mechanism Unit to include Power Park Module
P190 – Removal of the obligation on the CDCA to provide a witnessing and sealing service in respect of all Metering Equipment associated with CVA Metering Systems
Removal of the obligation on the CDCA to provide a witnessing and sealing service in respect of all Metering Equipment associated with CVA Metering Systems
P189 – Clarification to Fulfil the Intent of P174
Clarification to Fulfil the Intent of P174
P188 – Revision of Credit Default Provisions
Revision of Credit Default Provisions
P187 Introducing the ability for a BSC Party to request urgent status and for it to be considered by the Authority
Introducing the ability for a BSC Party to request urgent status and for it to be considered by the Authority
P186 – Rationalising the criteria for the submission and redeclaration of Demand & Generation Capacities
Rationalising the criteria for the submission and redeclaration of Demand & Generation Capacities