List of all BSC Modifications

(Showing items 281-300 of 485)

Show 10 | 20 | 50 | 100 | All

P205 – Increase in PAR level from 100MWh to 500MWh

Increase in PAR level from 100MWh to 500MWh
Read More

P204 – Scaled Zonal Transmission Losses

Scaled Zonal Transmission Losses
Read More

P203 – Introduction of a seasonal Zonal Transmission Losses scheme

Introduction of a seasonal Zonal Transmission Losses scheme
Read More

P202 – Energy Imbalance Incentive Band

Energy Imbalance Incentive Band
Read More

P201 – Energy Imbalance Tolerance Band

Energy Imbalance Tolerance Band
Read More

P200 – Introduction of a Zonal Transmission Losses scheme with Transitional Scheme

Introduction of a Zonal Transmission Losses scheme with Transitional Scheme
Read More

P199 Quantification of Demand Control in the BSC as instructed under OC.6 (c),(d) & (e) of the Grid Code

Quantification of Demand Control in the BSC as instructed under OC.6 (c),(d) & (e) of the Grid Code
Read More

P198 – Introduction of a Zonal Transmission Losses scheme

Introduction of a Zonal Transmission Losses scheme
Read More

P197 SVA Qualification Processes Review

SVA Qualification Processes Review
Read More

P196 – Treatment of Long Term Vacant Sites in Settlements

Treatment of Long Term Vacant Sites in Settlements
Read More

P195 – Neutrality for CCGT BMUs Switching Between Gas and Distillate

Neutrality for CCGT BMUs Switching Between Gas and Distillate
Read More

P194 – Revised Derivation of the ‘Main’ Energy Imbalance Price

Revised Derivation of the 'Main' Energy Imbalance Price
Read More

P193 – Improved Arrangements for Modification Proposals raised by the BSC Panel

Improved Arrangements for Modification Proposals raised by the BSC Panel
Read More

P192 – Change of Name of the Transmission Company

Change of Name of the Transmission Company
Read More

P191 – Revised definition of Balancing Mechanism Unit to include Power Park Module

Revised definition of Balancing Mechanism Unit to include Power Park Module
Read More

P190 – Removal of the obligation on the CDCA to provide a witnessing and sealing service in respect of all Metering Equipment associated with CVA Metering Systems

Removal of the obligation on the CDCA to provide a witnessing and sealing service in respect of all Metering Equipment associated with CVA Metering Systems
Read More

P189 – Clarification to Fulfil the Intent of P174

Clarification to Fulfil the Intent of P174
Read More

P188 – Revision of Credit Default Provisions

Revision of Credit Default Provisions
Read More

P187 Introducing the ability for a BSC Party to request urgent status and for it to be considered by the Authority

Introducing the ability for a BSC Party to request urgent status and for it to be considered by the Authority
Read More

P186 – Rationalising the criteria for the submission and redeclaration of Demand & Generation Capacities

Rationalising the criteria for the submission and redeclaration of Demand & Generation Capacities
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.