P285 – Revised treatment of RCRC for Interconnector BM Units

Revised treatment of RCRC for Interconnector BM Units
Read More

P284 – Expansion of Elexon’s role via the ‘contract model’

Expansion of Elexon’s role via the ‘contract model’
Read More

P283 – Reinforcing the Commissioning of Metering Equipment Processes

Reinforcing the Commissioning of Metering Equipment Processes
Read More

P282 – Allow MVRNs from Production to Consumption or Vice Versa

Allow MVRNs from Production to Consumption or Vice Versa
Read More

P281 Change of BSCCo Board of Directors & Chairman

Change of BSCCo Board of Directors & Chairman
Read More

P280 Introduction of new Measurement Classes

Introduction of new Measurement Classes
Read More

P279 Correcting the BSC description of the CDCA to SVAA interface for GSP Group net Export

Correcting the BSC description of the CDCA to SVAA interface for GSP Group net Export
Read More

P278 Treatment of Transmission Losses for Interconnector Users

Treatment of Transmission Losses for Interconnector Users
Read More

P277 Allow Interconnector BM Units to choose their P/C Status

Allow Interconnector BM Units to choose their P/C Status
Read More

P276 Introduce an additional trigger/threshold for suspending the market in the event of a Partial Shutdown

Introduce an additional trigger/threshold for suspending the market in the event of a Partial Shutdown
Read More

P275 Extending BSC Performance Assurance

Extending BSC Performance Assurance
Read More

P274 Cessation of Compensatory Adjustments

Cessation of Compensatory Adjustments
Read More

P273 Make the SVA Funding Share Calculation robust to changes in Scaling Weights

Make the SVA Funding Share Calculation robust to changes in Scaling Weights
Read More

P272 Mandatory Half Hourly Settlement for Profile Classes 5-8

Mandatory Half Hourly Settlement for Profile Classes 5-8
Read More

P271 NETSO Consultation in relation to any potential changes to the BSC which takes place in forums other than the BSC Panel

NETSO Consultation in relation to any potential changes to the BSC which takes place in forums other than the BSC Panel
Read More

P270 The Application of Line Loss Factors to GSPs that are not Transmission-interconnected

The Application of Line Loss Factors to GSPs that are not Transmission-interconnected
Read More

P269 Prevention of Base Trading Unit BMUs’ Account Status Flipping from Consumption to Production (the “Flipping” mod)

Prevention of Base Trading Unit BMUs’ Account Status Flipping from Consumption to Production (the “Flipping” mod)
Read More

P268 Clarify the P/C status process for exempt BM Units

Clarify the P/C status process for exempt BM Units
Read More

P267 Consideration of wider industry developments and duration of proposed changes when agreeing progression timetables

Consideration of wider industry developments and duration of proposed changes when agreeing progression timetables
Read More

P266 Improving the allocation of Reactive Power flows between Import and Export Metering Systems

Improving the allocation of Reactive Power flows between Import and Export Metering Systems