Change Consultations

List of Change Consultations

(Showing items 171-175 of 338)

Show 5 | 10 | 20 | All
View P359 Assessment Procedure Consultation

P359 Assessment Procedure ConsultationRead More

P359 proposes to introduce an automated process for GC and DC submissions. As such, the Modification seeks to:

  • Improve the accuracy of GC and DC declarations following a breach by introducing
    a consistent, objective and mechanistic method used for all re-declarations; and
  • Relieve BSC Parties of the burden of re-declaring GC and DC values following a
    breach by requiring Elexon to administer the mechanistic method.
View P356 Report Phase Consultation

P356 Report Phase ConsultationRead More

P356 will align the BSC with Grid Code Modification GC0099, which seeks to introduce the Interconnector Scheduled Transfer process to the Grid Code. This is in order to establish common, cross-code provisions which are compatible with both the EU single intraday market coupling processes, and GB and EU balancing processes. The P356 Assessment Report was presented to the Panel on 8 February 2018 and the Panel is now consulting on their views ahead of the Draft Modification Report being presented to the Panel on 8 March 2018.

View P356 Report Phase Consultation

P356 Report Phase ConsultationRead More

P356 will align the BSC with Grid Code Modification GC0099, which seeks to introduce the Interconnector Scheduled Transfer process to the Grid Code. This is in order to establish common, cross-code provisions which are compatible with both the EU single intraday market coupling processes, and GB and EU balancing processes. The P356 Assessment Report was presented to the Panel on 8 February 2018 and the Panel is now consulting on their views ahead of the Draft Modification Report being presented to the Panel on 8 March 2018.

View P365 Report Phase Consultation

P365 Report Phase ConsultationRead More

P365 seeks to amend the BSC such that the Elexon Board can determine whether to bid for the role of REC administrator (and perform the role if the contract is awarded to Elexon). This will be done via a separate not for profit subsidiary (RECASCo), funded by Elexon (through BSC Parties).

Elexon operates on a not for profit basis, therefore if the Elexon Board determines a bid should be submitted, the costs incurred will be borne by BSC Parties, with bid costs capped at the sum of £100k.

The proposed changes ensure that Elexon is ring-fenced from any enduring operational costs and risks associated with performing the role of REC administrator.

View P354 – Report Phase Consultation

P354 – Report Phase ConsultationRead More

P354 seeks to allow the Transmission Company to provide Applicable Balancing Services Volume Data (ABSVD) for non-BM Balancing Services to BSC Central Systems for allocation to the appropriate Supplier BM Units to correct Suppliers’ Energy Imbalance positions.