Change Consultations
List of Change Consultations
P332 Report Phase Consultation: Revisions to the Supplier Hub PrincipleRead More
This is the Report Phase Consultation for P332 ‘Revisions to the Supplier Hub Principle’.
This Modification seeks to address issues associated with customer preferred Supplier Agents. The proposed solution is a side letter between Elexon and Supplier Volume Allocation (SVA) Data Collectors (DCs) which will enable a Supplier who does not have a direct contract with the DC to enforce, as a last resort, the side letter as a proxy contract, to ensure that BSC obligations are met. The proposed solution will now apply to SVA DCs only as SVA Meter Operator governance will move from the BSC to the Retail Energy Code (REC) from 1 September 2021 as part of Retail Code Consolidation (RCC).
P421 ‘Align the BSC with Grid Code Modification GC0144 for TERRE Market Suspension’Read More
This Modification aligns the BSC with the provisions introduced into the Grid Code under GC0144 ‘Alignment of Market Suspension Rights to the EU Emergency and Restoration Code Article 35.1(b)’
P332 Assessment Procedure ConsultationRead More
This is the Assessment Procedure Consultation for P332 ‘Revisions to the Supplier Hub Principle’.
This Modification seeks to address issues associated with customer preferred Supplier Agents. The proposed solution is a side letter between Elexon and Supplier Volume Allocation (SVA) Data Collectors (DCs) which will enable a Supplier who does not have a direct contract with the DC to enforce, as a last resort, the side letter as a proxy contract, to ensure that BSC obligations are met. The proposed solution will now apply to SVA DCs only as SVA Meter Operator governance will move from the BSC to the Retail Energy Code (REC) from 1 September 2021 as part of Retail Code Consolidation (RCC).
P422 ‘Reflecting NCER Rules in the BSC’Read More
This Modification will update the BSC to ensure it accurately reflects the BSC provisions constituting the network code on electricity emergency and restoration (NCER) Rules in the mapping for the European Electricity Balancing Guideline (EBGL) Article 18 Terms and Conditions. Both the EBGL and the NCER were incorporated into UK law by the European Union (Withdrawal) Act 2018 following the UK-EU transition period.
P416 Report Phase ConsultationRead More
We have issued P416 ‘Introducing a route of appeal for the Annual Budget in line with the proposals for the Retail Energy Code’ for Report Phase Consultation, which you are invited to respond to by 3 June 2021.
P416 seeks to amend the BSC to include an appeals mechanism to Ofgem that could be used to challenge items in the Annual Budget in line with the appeals mechanism detailed in proposals for the Retail Energy Code (REC).
The Proposed Solution contains the following key features:
- Any BSC Party can raise an appeal against an Annual Budget line item within 10 WDs of the BSCCo Board issuing approval of the Annual Budget
- Provisions to allow the Authority to respond to appeals by referring individual items back to the Board for reconsideration, powers to change costings or remove individual items from the Annual Budget, and powers to dismiss appeals that are trivial or vexatious or has no reasonable prospect of success.
- Provisions to stop all of part of spend against appealed Annual Budget line items if specified conditions are met.