Change Consultations

List of Change Consultations

(Showing items 91-95 of 338)

Show 5 | 10 | 20 | All
View P332 Report Phase Consultation: Revisions to the Supplier Hub Principle

P332 Report Phase Consultation: Revisions to the Supplier Hub PrincipleRead More

This is the Report Phase Consultation for P332 ‘Revisions to the Supplier Hub Principle’.

This Modification seeks to address issues associated with customer preferred Supplier Agents. The proposed solution is a side letter between Elexon and Supplier Volume Allocation (SVA) Data Collectors (DCs) which will enable a Supplier who does not have a direct contract with the DC to enforce, as a last resort, the side letter as a proxy contract, to ensure that BSC obligations are met. The proposed solution will now apply to SVA DCs only as SVA Meter Operator governance will move from the BSC to the Retail Energy Code (REC) from 1 September 2021 as part of Retail Code Consolidation (RCC).

View P332 Assessment Procedure Consultation

P332 Assessment Procedure ConsultationRead More

This is the Assessment Procedure Consultation for P332 ‘Revisions to the Supplier Hub Principle’.

This Modification seeks to address issues associated with customer preferred Supplier Agents. The proposed solution is a side letter between Elexon and Supplier Volume Allocation (SVA) Data Collectors (DCs) which will enable a Supplier who does not have a direct contract with the DC to enforce, as a last resort, the side letter as a proxy contract, to ensure that BSC obligations are met. The proposed solution will now apply to SVA DCs only as SVA Meter Operator governance will move from the BSC to the Retail Energy Code (REC) from 1 September 2021 as part of Retail Code Consolidation (RCC).

View P422 ‘Reflecting NCER Rules in the BSC’

P422 ‘Reflecting NCER Rules in the BSC’Read More

This Modification will update the BSC to ensure it accurately reflects the BSC provisions constituting the network code on electricity emergency and restoration (NCER) Rules in the mapping for the European Electricity Balancing Guideline (EBGL) Article 18 Terms and Conditions. Both the EBGL and the NCER were incorporated into UK law by the European Union (Withdrawal) Act 2018 following the UK-EU transition period.

View P416 Report Phase Consultation

P416 Report Phase ConsultationRead More

We have issued P416 ‘Introducing a route of appeal for the Annual Budget in line with the proposals for the Retail Energy Code’ for Report Phase Consultation, which you are invited to respond to by 3 June 2021.

P416 seeks to amend the BSC to include an appeals mechanism to Ofgem that could be used to challenge items in the Annual Budget in line with the appeals mechanism detailed in proposals for the Retail Energy Code (REC).

The Proposed Solution contains the following key features:

  • Any BSC Party can raise an appeal against an Annual Budget line item within 10 WDs of the BSCCo Board issuing approval of the Annual Budget
  • Provisions to allow the Authority to respond to appeals by referring individual items back to the Board for reconsideration, powers to change costings or remove individual items from the Annual Budget, and powers to dismiss appeals that are trivial or vexatious or has no reasonable prospect of success.
  • Provisions to stop all of part of spend against appealed Annual Budget line items if specified conditions are met.

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.