Change Consultations

List of Change Consultations

(Showing items 61-65 of 338)

Show 5 | 10 | 20 | All
View P445 Report Phase Consultation

P445 Report Phase ConsultationRead More

This Modification seeks to allow the Funds Administration Agent (FAA) to process a Default Funding Share for unpaid Trading Charges earlier to reduce the cost of the borrowing facility and reduce the risk of shortfall. The Modification will also allow the Panel to instruct the FAA to release Trading Charges where the default relates to an Energy Supply Company Administration (ESCA).

View P427 Report Phase Consultation

P427 Report Phase ConsultationRead More

This Modification seeks to amend BSC Section Z to allow the Performance Assurance Board (PAB) to recommend that the Panel publish notices to industry in respect of Performance Assurance Parties’ (PAPs’) contribution to Settlement Risk along with relevant risk data.

This will increase the effectiveness of all detective and investigative Performance Assurance Techniques (PATs) including Error and Failure Resolution (EFR) through greater incentives. Improved efficiency of Performance Assurance Framework (PAF) with swifter resolution rates to EFR plans and any other significant issues that impact Settlement is expected.

  • BSC Section Z – Performance Assurance

 

View P425 Report Phase Consultation

P425 Report Phase ConsultationRead More

This Modification aims to reduce the requirement from two or more Suppliers, to one or more Suppliers, to be involved in a Shared Supplier Volume Allocation (SVA) Metering Arrangement.

This would allow multiple Suppliers to continue facilitating Shared SVA Metering Arrangements, while also allowing a single Supplier to make use of such an arrangement.

 

View July 2022 CPC

July 2022 CPCRead More

The July 2022 CPC batch contains the consultations for CP1565 ‘Updating BSCP520 to address operational issues in the Central Management System’ and CP1566 ‘Introducing the CVA Commissioning End to End Check (CEEC) process’

View P437 Assessment Procedure Consultation

P437 Assessment Procedure ConsultationRead More

P437 will amend BSC Section L ‘Metering’ and BSCP32 ‘Metering Dispensations’ to permit BSCCo (Elexon) to submit a Metering Dispensation application on request from a party, other than the Registrant of the applicable Metering System for new connections.

The incoming Registrant of the applicable new connections site will be notified by Elexon of any Metering Dispensation. Registrants will also be able to check for any Metering Dispensation on the existing Statement of Site Specific Dispensation and Generic Metering Dispensation log.

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.