Glossary
List of all BSC Change Proposals
CP1404 – Allowing Registration of Multiple Transmission System Boundary Point on one BSCP25 form and removal of requirement for OS coordinates for Grid Supply Points and onshore Transmission System Boundary Points
Allowing Registration of Multiple Transmission System Boundary Point on one BSCP25 form and removal of requirement for OS coordinates for Grid Supply Points and onshore Transmission System Boundary Points
CP1403 – Additional requirements to BSCP15 and BSCP25 for System Operators to provide more information on new connections
Additional requirements to BSCP15 and BSCP25 for System Operators to provide more information on new connections
CP1402 – Aligning the Deliverables in the Profile Administration Service Description with the Data Analyst Contract
Aligning the Deliverables in the Profile Administration Service Description with the Data Analyst Contract
CP1401 – Replace residual negative EACs for pre-RF Settlement Days without affecting post-RF data
Replace residual negative EACs for pre-RF Settlement Days without affecting post-RF data
CP1400 – Amendment of the System Energy flag via BSCP18
Amendment of the System Energy flag via BSCP18
CP1399 – Business Process Operations (BPO) Service rebranding
Business Process Operations (BPO) Service rebranding
CP1398 – Clarifications to BSCP520 ‘Unmetered Supplies registered in SMRS’
Clarifications to BSCP520 ‘Unmetered Supplies registered in SMRS’
CP1397 – Improvements to the Balancing Mechanism Reporting System (BMRS) Electricity Summary Page – Indicative Triad Demand Information tables
Improvements to the Balancing Mechanism Reporting System (BMRS) Electricity Summary Page – Indicative Triad Demand Information tables
CP1396 – Clarifications and Formalising scenarios for the BSCP509 Market Domain Data Changes Request Process
Clarifications and Formalising scenarios for the BSCP509 Market Domain Data Changes Request Process
CP1395 – Distribution of Configuration Details for Smart Meters
Distribution of Configuration Details for Smart Meters
CP1394 – Use of SMETS compliant Meters for Profiling
Use of SMETS compliant Meters for Profiling
CP1393 – Technical Assurance – CDC Check
Technical Assurance - CDC Check
CP1392 – BSCP18 Bid-Offer Acceptance Related Data Corrections to the SAA system via Electronic File Transfer method (BMRA-I002) instead of manual Email method (SAA-I033).
BSCP18 Bid-Offer Acceptance Related Data Corrections to the SAA system via Electronic File Transfer method (BMRA-I002) instead of manual Email method (SAA-I033).
CP1391 – Clarify the existing MDD registration criteria for new Suppliers within the MDD (BSCP509) and Qualification (BSCP537) procedures
Clarify the existing MDD registration criteria for new Suppliers within the MDD (BSCP509) and Qualification (BSCP537) procedures
CP1390 – New MDD Entity for SMETS Version
New MDD Entity for SMETS Version
CP1389 – Removal of Lux Meter Requirement for PECU Arrays
Removal of Lux Meter Requirement for PECU Arrays
CP1388 – Meter Technical Details for Smart Meters
Meter Technical Details for Smart Meters
CP1387 – Clarifications to BSCP533 and Appendices
Clarifications to BSCP533 and Appendices
CP1386 – Improving Settlement Accuracy for Unmetered Supply on a Change of Supplier or Change of Agent
Improving Settlement Accuracy for Unmetered Supply on a Change of Supplier or Change of Agent
CP1385 – Notification of NHH Energisation Status Change by LDSO
Notification of NHH Energisation Status Change by LDSO
CP1384 – Clarification on disconnection and associated processes
Clarification on disconnection and associated processes
CP1383 – Upgrade of NHHDA and EAC/AA systems to Oracle 11g
Upgrade of NHHDA and EAC/AA systems to Oracle 11g
CP1382 – Clarification of IDD rules for leading zeroes
Clarification of IDD rules for leading zeroes
CP1381 – Negative Wind Generation Forecast on BMRS
Negative Wind Generation Forecast on BMRS
CP1380 – Removing Agent Restrictions for Appointment of PRA Agent
Removing Agent Restrictions for Appointment of PRA Agent
CP1379 – Service Review of the Technical Assurance of Metering Systems
Service Review of the Technical Assurance of Metering Systems
CP1378 – Alternative to CP1377 – Clarifying rules on Third Party Access on Licence Exempt Distribution Network
Alternative to CP1377 - Clarifying rules on Third Party Access on Licence Exempt Distribution Network
CP1377 – Clarifying rules on Third Party Access on Licence Exempt Distribution Network
Clarifying rules on Third Party Access on Licence Exempt Distribution Network
CP1376 – Issues with Reporting Failed Instructions (D0023) Flows
Issues with Reporting Failed Instructions (D0023) Flows
CP1375 – Increasing Material Impact Threshold
Increasing Material Impact Threshold
CP1374 – Pre-site audit visits – Technical Assurance of Metering
Pre-site audit visits - Technical Assurance of Metering
CP1373 – Uploading multiple ECVNs/MVRNs via the EWS
Uploading multiple ECVNs/MVRNs via the EWS
CP1372 – Housekeeping Change to Demand BM Unit Example in BSCP75
Housekeeping Change to Demand BM Unit Example in BSCP75
CP1371 – Removing requirements for Line Loss Factor Audit to be performed at the LDSO offices
Removing requirements for Line Loss Factor Audit to be performed at the LDSO offices
CP1370 – Revised rules for default LLF values
Revised rules for default LLF values
CP1369 – Increased Flexibility in BSCP550 Data Splitting Algorithms
Increased Flexibility in BSCP550 Data Splitting Algorithms
CP1368 – Clarify/Resolve Operational Issues Related to Unmetered Supplies in SMRS
Clarify/Resolve Operational Issues Related to Unmetered Supplies in SMRS
CP1367 – Reporting Data relating to the East-West Interconnector on the BMRS
Reporting Data relating to the East-West Interconnector on the BMRS
CP1366 – Data Quality Obligations for Outgoing Supplier Agents
Data Quality Obligations for Outgoing Supplier Agents
CP1365 – Shortening Profile Production Timescales
Shortening Profile Production Timescales
CP1364 – Remove BSC Systems constraint on maximum negative CALF values
Remove BSC Systems constraint on maximum negative CALF values
CP1363 – Addressing Settlement Data Adjustments in a Balanced Manner
Addressing Settlement Data Adjustments in a Balanced Manner
CP1362 – Removal of Residual Negative EACs
Removal of Residual Negative EACs
CP1361 – Removal of Extreme EACs
Removal of Extreme EACs
CP1360 – Inclusion of Audit Records for Gross Volume Correction and Dummy Meter Exchanges
Inclusion of Audit Records for Gross Volume Correction and Dummy Meter Exchanges
CP1359 – Introducing new products into the Market Index Definition Statement
Introducing new products into the Market Index Definition Statement
CP1358 – Change to timeband weightings in the Market Index Definition Statement
Change to timeband weightings in the Market Index Definition Statement
CP1357 – Correction to MSID Allocation Process
Correction to MSID Allocation Process
CP1356 – Demand BM Unit Aggregation Rule Example for BSCP75
Demand BM Unit Aggregation Rule Example for BSCP75
CP1355 – Update to BSCP537 Qualification Appendix 2: Testing Requirements
Update to BSCP537 Qualification Appendix 2: Testing Requirements