CP1544 ‘BSCCo Approved EFR Representative sign-off required for any EFR plan following escalation’
CP1543 ‘Use of DTC dataflow D0051 in the Half Hourly sector’
CP1542 ‘Transfer the obligation to visit de-energised sites annually from Data Collector to Supplier’
CP1541 ‘Use of D0004 in BSCP502’
CP1540 ‘Strengthening the Qualification – Change of Ownership Process’
CP1539 ‘Inclusion of LCCC as an Affected party in Metering Dispensation applications’
CP1538 Correct Specification of TERRE Tibco messages
The Assessment Report for CP1538 was presented to the ISG on 2 February 2021, where it was approved for implementation in the April 2021 ad-hoc BSC release
CP1537 ‘Extending the Timescales for agreeing Technical Assurance of Performance Assurance Parties (TAPAP) Findings Reports’
CP1536 ‘Use of DTC data flow D0379 for submission of unmetered Half Hourly data’
CP1535 ‘Interconnector Fuel Type Category update to BMRS’
CP1535 seeks to Add the North Sea Link (NSL) Interconnector to the BMRS. CP1535 will also enable the withdrawal of the CP1516 interim solution to incorporate data from IFA2 and ElecLink Interconnectors on the BMRS.
CP1534 ‘Introduce Change of Supplier (CoS) – No Meter Process’
CP1533 ‘Mandatory Sending of D0052 for DCC serviced SVA NHH Metering Systems’
CP1533 intends to update clause 3.2.6.50 in BSCP504 to remove instances of the word “new” in order to make it clear that D0052s shall be sent in all instances.
CP1532 ‘Reduce Half Hourly Change of Supplier timelines to meet the Initial Settlement Run’
CP1531 ‘Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run’
Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run
CP1530 ‘Introduction of a formalised process for the validation of measurement transformer ratios by Elexon’
CP1529 ‘Earlier initiation of Supplier Agreed Meter Readings process’
CP1528 ‘CoP4 clarification of BSC Party responsibility for Commissioning of measurement transformers that the BSC Party adopts’
CP1527 ‘Increase the minimum data storage capacity for Settlement Outstations and mandate specific selectable integration periods for Metering Codes of Practice’
CP1526 ‘Introduction of Service Level Agreements for rectifying Meter faults’
CP1526 seeks to introduce formal Service Level Agreements that should be adhered to by Meter Operator Agents (MOAs) and Licensed Distribution System Operators (LDSOs) when rectifying Half Hourly Meter faults to ensure continued overall accountability of rectifying faults on Metering Equipment.
CP1525 ‘Improving the involvement of the LDSO in the fault resolution process’
CP1525 seeks to define a new process that would place obligations on Licensed Distribution System Operators (LDSOs) to rectify Half Hourly Meter faults where the fault is with Metering Equipment owned by the LDSO.