Glossary
List of all BSC Change Proposals
CP1304 – Exclusion of certain Site Visit Check Codes (SVCC) within the Long Term Vacant (LTV) site process
Exclusion of certain Site Visit Check Codes (SVCC) within the Long Term Vacant (LTV) site process
CP1303 – Requirement on Half Hourly Data Collectors to Estimate Missing Reactive Power Demand Values
Requirement on Half Hourly Data Collectors to Estimate Missing Reactive Power Demand Values
CP1302 – Requirement on Half Hourly Data Collectors to Validate Reactive Power Demand Values
Requirement on Half Hourly Data Collectors to Validate Reactive Power Demand Values
CP1301 – Registration Requirements for System Connection Points Between Onshore Distribution Systems and Offshore Transmission Systems
Registration Requirements for System Connection Points Between Onshore Distribution Systems and Offshore Transmission Systems
CP1300 – System changes to support Change of Market Participant ID for the SVA Agent and MDD Agent Roles from ‘CAPG’ to ‘SVAA’
System changes to support Change of Market Participant ID for the SVA Agent and MDD Agent Roles from ‘CAPG’ to ‘SVAA’
CP1299 – Requirement on Half Hourly Data Collectors to Collect and Report Reactive Power Data
Requirement on Half Hourly Data Collectors to Collect and Report Reactive Power Data
CP1298 – Requirement on MOAs to Configure Meters to Record HH Reactive Power Data
Requirement on MOAs to Configure Meters to Record HH Reactive Power Data
CP1297 – Mandatory Capability to Record Reactive Power Demand Values in CoP10 meters
Mandatory Capability to Record Reactive Power Demand Values in CoP10 meters
CP1296 – Mandatory Capability to Record Reactive Power Demand (kvar) Values in Code of Practice 5 (CoP5) Meters
Mandatory Capability to Record Reactive Power Demand (kvar) Values in Code of Practice 5 (CoP5) Meters
CP1295 – Process for distribution of MDD Updates not included in D0269/D0270 flows
Process for distribution of MDD Updates not included in D0269/D0270 flows