Glossary
List of all BSC Change Proposals
CP1404 – Allowing Registration of Multiple Transmission System Boundary Point on one BSCP25 form and removal of requirement for OS coordinates for Grid Supply Points and onshore Transmission System Boundary Points
Allowing Registration of Multiple Transmission System Boundary Point on one BSCP25 form and removal of requirement for OS coordinates for Grid Supply Points and onshore Transmission System Boundary Points
CP1403 – Additional requirements to BSCP15 and BSCP25 for System Operators to provide more information on new connections
Additional requirements to BSCP15 and BSCP25 for System Operators to provide more information on new connections
CP1402 – Aligning the Deliverables in the Profile Administration Service Description with the Data Analyst Contract
Aligning the Deliverables in the Profile Administration Service Description with the Data Analyst Contract
CP1401 – Replace residual negative EACs for pre-RF Settlement Days without affecting post-RF data
Replace residual negative EACs for pre-RF Settlement Days without affecting post-RF data
CP1400 – Amendment of the System Energy flag via BSCP18
Amendment of the System Energy flag via BSCP18
CP1399 – Business Process Operations (BPO) Service rebranding
Business Process Operations (BPO) Service rebranding
CP1398 – Clarifications to BSCP520 ‘Unmetered Supplies registered in SMRS’
Clarifications to BSCP520 ‘Unmetered Supplies registered in SMRS’
CP1397 – Improvements to the Balancing Mechanism Reporting System (BMRS) Electricity Summary Page – Indicative Triad Demand Information tables
Improvements to the Balancing Mechanism Reporting System (BMRS) Electricity Summary Page – Indicative Triad Demand Information tables
CP1396 – Clarifications and Formalising scenarios for the BSCP509 Market Domain Data Changes Request Process
Clarifications and Formalising scenarios for the BSCP509 Market Domain Data Changes Request Process
CP1395 – Distribution of Configuration Details for Smart Meters
Distribution of Configuration Details for Smart Meters
CP1394 – Use of SMETS compliant Meters for Profiling
Use of SMETS compliant Meters for Profiling
CP1393 – Technical Assurance – CDC Check
Technical Assurance - CDC Check
CP1392 – BSCP18 Bid-Offer Acceptance Related Data Corrections to the SAA system via Electronic File Transfer method (BMRA-I002) instead of manual Email method (SAA-I033).
BSCP18 Bid-Offer Acceptance Related Data Corrections to the SAA system via Electronic File Transfer method (BMRA-I002) instead of manual Email method (SAA-I033).
CP1391 – Clarify the existing MDD registration criteria for new Suppliers within the MDD (BSCP509) and Qualification (BSCP537) procedures
Clarify the existing MDD registration criteria for new Suppliers within the MDD (BSCP509) and Qualification (BSCP537) procedures
CP1390 – New MDD Entity for SMETS Version
New MDD Entity for SMETS Version
CP1389 – Removal of Lux Meter Requirement for PECU Arrays
Removal of Lux Meter Requirement for PECU Arrays
CP1388 – Meter Technical Details for Smart Meters
Meter Technical Details for Smart Meters
CP1387 – Clarifications to BSCP533 and Appendices
Clarifications to BSCP533 and Appendices
CP1386 – Improving Settlement Accuracy for Unmetered Supply on a Change of Supplier or Change of Agent
Improving Settlement Accuracy for Unmetered Supply on a Change of Supplier or Change of Agent
CP1385 – Notification of NHH Energisation Status Change by LDSO
Notification of NHH Energisation Status Change by LDSO