BSC Changes impacting a Virtual Lead Party

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting a Virtual Lead Party. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-10 of 29)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

CP1602 Enabling AMMOAs to be appointed as MOA for both variants of Asset Metering Type 4

This Change Proposal will allow AMMOAs to be appointed as MOA for both variants of Asset Metering Type 4.

Read More

P472 Amendment to provisions for Parties to bring claims against BSC Agents in BSC Section E

Read More

P483 Enabling Asset Metering for Non-Half Hourly Boundary Metering Systems

The implementation of BSC Modification P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point’ allows Asset Metering System Identifier (AMSID) Pairs to participate in Settlement by utilising metering situated behind the Boundary Point. However, it requires that the associated MSID Pair—the Boundary Point Metering System—must be settled Half-Hourly. This requirement prevents most domestic consumers from participating in flexibility services with smart devices, as the majority are not half-hourly settled, and consumers, along with their Virtual Lead Parties (VLPs), cannot mandate changes to the meter’s Measurement Class.

Read More

P463 Introduce a Standard Change Process

To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.

Read More

P458 Introducing Data Controller and Processor Obligations in the BSC for MHHS Testing

The purpose of this Modification is to address the need for personal information sharing in the Balancing and Settlement Code (BSC), specifically in the context of the Market-wide Half Hourly Settlement (MHHS) testing. The current BSC General Data Protection Regulation (GDPR) and data protection provisions were not designed to allow the sharing of personal information, which has now become necessary for the planned MHHS testing.

Read More

CP1598 Amending the EMDS to add missing Scenario Variants for P375

CP1598 sought to update the Retail Energy Code (REC) Energy Market Data Specification (EMDS), which includes various Market Message Scenario Variants relevant to BSC (Balancing and Settlement Code) processes. BSCP603, introduced for BSC Modification P375, outlined new Scenario Variants of existing Supplier Hub Market Messages to support Asset Metering Virtual Lead Party (AMVLP) processes.

Read More

P415 Facilitating access to wholesale markets for flexibility dispatched by Virtual Lead Parties

P415 seeks to amend the BSC to allow Virtual Lead Parties (VLPs) to participate in the GB wholesale market. 

Read More

P444 Compensation for Virtual Lead Party actions in the Balancing Mechanism

Read More

P470 Protecting the Imbalance Price from IOLC related distortions

P470 seeks to reprice Offer prices in the Imbalance Settlement Price calculation where those Offers were impacted by price restrictions introduced by the Inflexible Offers Licence Condition (IOLC).

Read More

P467 Enduring Solution in an event of a Gas Deficit Emergency (GDE)

This is a follow on Modification from Issue 105 and provides an enduring solution in an event of a Gas Deficit Emergency (GDE). 

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.