BSC Changes impacting the National Electricity Transmission System Operator

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting the National Electricity Transmission System Operator (NETSO). Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-5 of 21)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

P472 Amendment to provisions for Parties to bring claims against BSC Agents in BSC Section E

Read More

P480 Publication of regional demand forecast data to fulfil ESRS Reporting requirements

P480 seeks to facilitate the Electricity System Restoration Standard (ESRS) requirements to publish the day-ahead peak demand forecast for each restoration region and the demand restored in each restoration region published hourly during a System Restoration on BMRS (Elexon’s Insights Solution Platform). P480 is a consequential Modification to GC0156 ‘Facilitating the Implementation of the Electricity System Restoration Standard’.

This Proposed Solution is to make changes to BSC system and BSC Section Q ‘Balancing Mechanism Activities’ and Code Subsidiary Documents to implement these provisions outlined in GC0156. 

Read More

P463 Introduce a Standard Change Process

To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.

Read More

P458 Introducing Data Controller and Processor Obligations in the BSC for MHHS Testing

The purpose of this Modification is to address the need for personal information sharing in the Balancing and Settlement Code (BSC), specifically in the context of the Market-wide Half Hourly Settlement (MHHS) testing. The current BSC General Data Protection Regulation (GDPR) and data protection provisions were not designed to allow the sharing of personal information, which has now become necessary for the planned MHHS testing.

Read More

P412 Ensuring non-BM Balancing Services providers pay for non-delivery imbalances at a price that reflects the real-time value of energy

This Modification will introduce imbalance charges for non-Balancing Mechanism (BM) Balancing Services providers, where their delivery does not match instructed volumes. This will mean the GB market more effectively meets the requirements of the Clean Energy Package.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.