This page shows which Modifications and Change Proposals have been identified as impacting a Licensed Distribution Systems Operator. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.
P472 Amendment to provisions for Parties to bring claims against BSC Agents in BSC Section E
P477 Data Protection Provisions for Market-wide Half Hourly Settlement
The purpose of this Modification is to address the need for personal information sharing in the Balancing and Settlement Code (BSC), once the Market-wide Half Hourly Settlement (MHHS) arrangements are operational.
P441 Creation of Complex Site Classes
This Modification looks to progress a recommendation of the Issue 88 Workgroup to introduce Complex Site classes.
P434 Half Hourly Settlement for UMS Metering Systems
This Modification will require a period of mandatory Change of Measurement Class (CoMC) activity for all Non-Half Hourly (NHH) Unmetered Supplies (UMS) Metering Systems to complete before the Market Wide Half Hourly Settlement (MHHS) migration to the Target Operating Model (Milestone 11 (M11) in the MHHS Timetable). At the time of writing, this would need to complete by October 2025. It will also require all new UMS connections to be settled Half Hourly (HH) from 12 months prior to M11, currently October 2024 (post CR055 decision).
P478 Implementation of MHHS Arrangements
This Modification proposes changes to the BSC to enable the Market-Wide Half-Hourly Settlement (MHHS) arrangements.
P455 On-Site Aggregation as a method to facilitate Third Party Access
This Modification seeks to establish a more cost effective and efficient method for delivering Third Party Access on private networks that include domestic and small business customers. It does so by enabling aggregated meter data from sub meters on private networks to be submitted into Settlement in lieu of data from Settlement meters installed at the Boundary Point.
P463 Introduce a Standard Change Process
To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.
P458 Introducing Data Controller and Processor Obligations in the BSC for MHHS Testing
The purpose of this Modification is to address the need for personal information sharing in the Balancing and Settlement Code (BSC), specifically in the context of the Market-wide Half Hourly Settlement (MHHS) testing. The current BSC General Data Protection Regulation (GDPR) and data protection provisions were not designed to allow the sharing of personal information, which has now become necessary for the planned MHHS testing.
CP1597 BSCP513 Text Change – Bulk Change of Agent
This CP proposes to remove references to Non Half Hourly Agent roles, and the reference of excluding SVA NHH MOA appointments from BSCP513 to align with Retail Energy Code.
P474 Governance, funding and operation of the DIP
This Modification proposes changes to the BSC to enable the ongoing governance, funding and operation of the Data Integration Platform (DIP).
CP1591 New Site Visit Check Code Valid Set value
The implementation of Distribution Connection and Use of System Agreement (DCUSA) Modification DCP411 ‘Charging De-energised sites’ involves updating the J0024 data set by adding a new Enumeration Value.
P432 Half Hourly Settlement for CT Advanced Metering Systems
This Modification proposes to align the BSC definition of an Advanced Meter with that in the Standard License Conditions (SLC) and to set explicit Half Hourly (HH) Settlement obligations for Current Transformer (CT) Advanced Meters ahead of the migration to Market-wide Half-Hourly Settlement (MHHS).
P454 Removal of BSC obligations to provide BMRS Data via TIBCO and the High Grade Service
This Modification would remove the existing requirement within BSC Section V ‘Reporting’ for the Balancing Mechanism Reporting Agent (BMRA) to provide BMR Service (BMRS) data via the legacy High Grade Service, otherwise referred to as the TIBCO service.
P454 is a recommendation from BSC Issue 95, which considered the impacts associated with maintaining the legacy TIBCO service.
P466 BSC Section N Modernisation
This Modification seeks to update BSC Section N ‘Clearing Invoicing and Payment’ to support the effective running of the Funds Administration Agent (FAA). The Modification will align the BSC with Elexon’s updated financial systems and modern banking practices to increase the efficiency of service provided to industry.
CP1587 Obsolete Metering Equipment
Providing a process and transition period to remove unsupported assets and mitigate the risk to Settlement.
CP1578 Enabling Embedded LDSOs to submit Site Specific LLFs
This CP proposes updates to remove issues that may stop Embedded LDSOs from submitting Site Specific LLFs. These updates will define the process for submitting Site Specific LLFs, including establishing deadlines and requirements for the Embedded and Host LDSOs.
P453 Metering Dispensation process improvements and clarification to the CoPs
This Modification seeks to progress two recommendations from Issue 93 ‘Review of the BSC metering Codes of Practice’. The first recommendation clarifies the relevant Code of Practice (CoP) for circuits embedded behind the Boundary Point Metering System or Defined Metering Point (DMP). The second recommendation eliminates the need for Metering Dispensations when the Actual Metering Point (AMP) does not coincide with the DMP, but there is no impact on Settlement accuracy.
P460 Amend the responsibility to propose and consult on a MHHS Migration Plan
P460 aims to change responsibility for proposing, consulting on and obtaining approval of the Market-wide Half Hourly Settlement (MHHS) Migration Plan from BSCCo to the Market-wide Half Hourly Settlement Programme (MHHSP).
P457 Replace the Electricity Arbitration Association with the London Court of International Arbitration
P457 proposes to remove the Electricity Arbitration Association (EAA) from the BSC and replace with the London Court of International Arbitration (LCIA) to deliver better value for money and service.
CP1574 Improving the use of the D0215 data flow in the relevant industry processes
This CP seeks to implement the recommendation from the Issue 99 Workgroup, which involves updating Balancing and Settlement Code Procedure (BSCP) 515 ‘Licensed Distribution’ and the Retail Energy Code (REC) Meter Operator Schedule 14 documents to streamline the use of the D0215 flow in its associated processes.