BSC Changes impacting a HH Data Collector

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting a Half Hourly Data Collector. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-20 of 38)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

P459 Allowing different Supplier Agents to be appointed to Import and Export MSIDs

This Modification would allow Suppliers to appoint different Supplier Volume Allocation (SVA), Meter Operator Agents (MOAs) and Data Collectors (DCs) for the Import and Export Metering System Identifiers (MSIDs) where Data Communications Company (DCC) adopted smart meters are installed. Being able to appoint different Supplier Agents across Import/Export MSIDs will remove a barrier preventing the use of Export MSIDs for small-scale micro-generation, which currently disbenefits Suppliers, sales and operators of micro-generation, and electricity consumers.

Read More

P442 Reporting chargeable volumes for exempt and licensed supply

This Modification seeks to allow correct reporting of chargeable volumes to the EMRS company for SVA Metering Systems that record both exempt supply and licensed supply through the addition of a new third party role, the “Exempt Supply Notification Agent”.

Read More

P441 Creation of Complex Site Classes

This Modification looks to progress a recommendation of the Issue 88 Workgroup to introduce Complex Site classes.

Read More

P434 Half Hourly Settlement for UMS Metering Systems

This Modification will require a period of mandatory Change of Measurement Class (CoMC) activity for all Non-Half Hourly (NHH) Unmetered Supplies (UMS) Metering Systems to complete before the Market Wide Half Hourly Settlement (MHHS) migration to the Target Operating Model (Milestone 11 (M11) in the MHHS Timetable). At the time of writing, this would need to complete by October 2025. It will also require all new UMS connections to be settled Half Hourly (HH) from 12 months prior to M11, currently October 2024 (post CR055 decision).

Read More

P478 Implementation of MHHS Arrangements

This Modification proposes changes to the BSC to enable the Market-Wide Half-Hourly Settlement (MHHS) arrangements.

Read More

P455 On-Site Aggregation as a method to facilitate Third Party Access

This Modification seeks to establish a more cost effective and efficient method for delivering Third Party Access on private networks that include domestic and small business customers. It does so by enabling aggregated meter data from sub meters on private networks to be submitted into Settlement in lieu of data from Settlement meters installed at the Boundary Point.

Read More

P463 Introduce a Standard Change Process

To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.

Read More

CP1598 Amending the EMDS to add missing Scenario Variants for P375

CP1598 sought to update the Retail Energy Code (REC) Energy Market Data Specification (EMDS), which includes various Market Message Scenario Variants relevant to BSC (Balancing and Settlement Code) processes. BSCP603, introduced for BSC Modification P375, outlined new Scenario Variants of existing Supplier Hub Market Messages to support Asset Metering Virtual Lead Party (AMVLP) processes.

Read More

P474 Governance, funding and operation of the DIP

This Modification proposes changes to the BSC to enable the ongoing governance, funding and operation of the Data Integration Platform (DIP).

Read More

CP1594 Creating an Approval Process for New and Legacy Communication Types

Older metering communication types are quickly becoming redundant and are being replaced by newer communication types. Elexon are proposing to create an approvals process to allow for the managed end dating of older technologies, such as Public Switched Telephone Network (PSTN), Circuit Switched Data (CSD) and subsequently 2G.

Read More

P432 Half Hourly Settlement for CT Advanced Metering Systems

This Modification proposes to align the BSC definition of an Advanced Meter with that in the Standard License Conditions (SLC) and to set explicit Half Hourly (HH) Settlement obligations for Current Transformer (CT) Advanced Meters ahead of the migration to Market-wide Half-Hourly Settlement (MHHS). 

Read More

P456 Enable Elexon to procure ancillary Technology Services for use by BSC Agents

Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.

Read More

CP1579 Allowing HHDCs to undergo Protocol Approval before completing Qualification

This Change Proposal will allow Half Hourly Data Collectors (HHDCs) and Asset Metering Half Hourly Data Collectors (AMHHDCs) to undergo Protocol Approval before or during the Qualification process.

Read More

CP1575 Permitting the use of busbar voltage transformers within metering Codes of Practice 1 and 2

This CP seeks to implement the recommendation from the Issue 87 ‘Busbar voltage transformer (VT) metering for Offshore wind farms under OFTO arrangements’ Workgroup by updating Code of Practice 1 and Code of Practice 2 to allow busbar VTs to be used at Offshore and onshore wind farms. 

Read More

CP1585 Submission of Half Hourly data for Embedded LDSO sites to Host LDSO

This CP proposes that the Half Hourly Data Collector send Half Hourly data for Embedded LDSO connected sites to the Host LDSO via D0275 and/or D0036 to improve the quality of forecasting and reduce manual effort. 

Read More

P427 Publication of Performance Assurance Parties’ impact on Settlement Risk

This Modification seeks to amend BSC Section Z to allow the Performance Assurance Board (PAB) to recommend that the Panel publish notices to industry in respect of Performance Assurance Parties’ (PAPs’) contribution to Settlement Risk along with relevant risk data.

Read More

CP1560 Demand Control Event Process Clarifications

This CP seeks to clarify the processes that take place after a Demand Control Event by amending the relevant Code Subsidiary Documents to ensure clarity and consistency. 

Read More

CP1555 Consumption data for Measurement Classes G and F

This CP proposes to update the requirements in BSCP502 to require HHDCs to send D0036 or D0275 for non-Data Communications Company (DCC) enrolled Metering Systems and/or D0380 for DCC enrolled Metering Systems to Licenced Distribution System Operators (LDSOs).

Read More

CP1565 Updates to address Central Management System issues

This CP seeks to update BSCP520 to contain clearly outlined processes for approval and fault reporting of Central Management Systems.

Read More

CP1559 Complex Sites Process Improvements

This Change Proposal will deliver improvements to the Complex Sites process.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.