This page shows which Modifications and Change Proposals have been identified as impacting a Half Hourly Data Aggregator. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.
CP1599 Remove the requirement in BSCP602 to specify the Half Hourly Data Aggregator in Non-Final Demand Declarations
CP1599 proposes updates to BSCP602 to remove the requirement for Non-Final Demand Declarations to specify the HHDA and Effective From Date (EFD) for each MSID. It also adds a process in the Customer Solution to check if an MSID in the SVA Metering System and Asset Metering System Register has transitioned to the MHHS arrangements and validate and store the relevant MSID information.
P434 Half Hourly Settlement for UMS Metering Systems
This Modification will require a period of mandatory Change of Measurement Class (CoMC) activity for all Non-Half Hourly (NHH) Unmetered Supplies (UMS) Metering Systems to complete before the Market Wide Half Hourly Settlement (MHHS) migration to the Target Operating Model (Milestone 11 (M11) in the MHHS Timetable). At the time of writing, this would need to complete by October 2025. It will also require all new UMS connections to be settled Half Hourly (HH) from 12 months prior to M11, currently October 2024 (post CR055 decision).
P478 Implementation of MHHS Arrangements
This Modification proposes changes to the BSC to enable the Market-Wide Half-Hourly Settlement (MHHS) arrangements.
P463 Introduce a Standard Change Process
To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.
P474 Governance, funding and operation of the DIP
This Modification proposes changes to the BSC to enable the ongoing governance, funding and operation of the Data Integration Platform (DIP).