This page shows which Modifications and Change Proposals have been identified as impacting a CVA Meter Operator Agent. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.
P479 Amendments to the Credit Cover calculations
This Modification seeks to amend the Credit Cover calculations to make more accurate and operationally efficient estimates of Energy Indebtedness, using data available closer to real time.
P463 Introduce a Standard Change Process
To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.
CP1598 Amending the EMDS to add missing Scenario Variants for P375
CP1598 sought to update the Retail Energy Code (REC) Energy Market Data Specification (EMDS), which includes various Market Message Scenario Variants relevant to BSC (Balancing and Settlement Code) processes. BSCP603, introduced for BSC Modification P375, outlined new Scenario Variants of existing Supplier Hub Market Messages to support Asset Metering Virtual Lead Party (AMVLP) processes.
CP1587 Obsolete Metering Equipment
Providing a process and transition period to remove unsupported assets and mitigate the risk to Settlement.
P453 Metering Dispensation process improvements and clarification to the CoPs
This Modification seeks to progress two recommendations from Issue 93 ‘Review of the BSC metering Codes of Practice’. The first recommendation clarifies the relevant Code of Practice (CoP) for circuits embedded behind the Boundary Point Metering System or Defined Metering Point (DMP). The second recommendation eliminates the need for Metering Dispensations when the Actual Metering Point (AMP) does not coincide with the DMP, but there is no impact on Settlement accuracy.