List of homepage news articles

This page lists all of the news articles we have produced over the last year. Any news articles older than 1 year are removed from the website as they will have concluded their designated lifecycle. Please contact us if you are looking for specific information on any subjects we have covered.

(Showing items 41-45 of 422)

Show 5 | 10 | 20 | All
View CALF values for winter 2024 BSC Season: 1 November 2024 appeal deadline

CALF values for winter 2024 BSC Season: 1 November 2024 appeal deadline

The Credit Assessment Load Factor (CALF) values for the winter 2024 BSC Season, which runs from 1 December 2024 to 28 February 2025, are available from the Credit/Credit Alerting section under the Financial and Credit menu on the ELEXON Portal.

If you are the Lead Party of a non-Credit Qualifying BMU, you can appeal an assigned CALF value if you believe it does not accurately represent your expected activity.

Read More
View Consultation: P350 Draft Reference Network Mapping Statement 2025-26

Consultation: P350 Draft Reference Network Mapping Statement 2025-26Read More

This consultation seeks views on the draft reference Network Mapping Statement (NMS) for use in the allocation of Transmission Loss Factors (TLFs) for BSC Year 2025-2026.

View Consultation on new GSP for UK Power Distribution (Powergate GSP) – 09 August 2024

Consultation on new GSP for UK Power Distribution (Powergate GSP) – 09 August 2024Read More

ELEXON has received a new GSP registration application from the National Electricity Transmission System Operator (NETSO). UK Power Distribution (UKPD) is connecting two new circuits at the Willesden 66 kV substation.

The National Electricity Transmission System Operator (NETSO) proposes that GSP POWE_H is allocated to the Southern (_H) GSP Group.

This new Systems Connection Point will be registered in Settlement as a new GSP, to be known as Powergate GSP (POWE_H).

View Deadline for applications to join the Capacity Market Advisory Group is 12 August

Deadline for applications to join the Capacity Market Advisory Group is 12 August

We are looking for new members to join our the Capacity Market Advisory Group (CMAG) which plays a role in developing, analysing, prioritising and making recommendations to Ofgem for changes to the Capacity Market Rules.

CMAG members include impartial experts on the Capacity Market and other stakeholders.

How to apply

  • Please complete the CM Experience Survey by 17:00 on Monday 12 August 2024.
  • You also need to send in your CV to [email protected] explaining that you are applying to become a member.

Find out more about the CMAG

  • Visit the CMAG website
  • See information about current CMAG members
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.