List of homepage news articles
This page lists all of the news articles we have produced over the last year. Any news articles older than 1 year are removed from the website as they will have concluded their designated lifecycle. Please contact us if you are looking for specific information on any subjects we have covered.
BSC Panel’s letter to Ofgem on consultation on the Future Ownership of Elexon
Michael Gibbons CBE, FEI, BSC Panel Chair, and Dr. Phil Hare, BSC Panel Deputy Chair, have sent a letter on behalf of the BSC Panel as part of the Consultation on the Future Ownership of Elexon that Ofgem issued on 14 July 2022. BEIS and Ofgem have jointly published the consultation on the change in ownership of Elexon. This follows the publication of the Future System Operator (FSO) consultation response on 6th April 2022.
Monitoring of the meter stock shortage, driven by global materials availability and supply chain challenges
Due to a global shortage of materials and the impact of COVID-19 on global supply chains, there is a shortage of semi-conductors among other crucial components, which impacts the ability of Meter manufacturers to produce and supply electricity Meters, including those required for Settlement under the BSC.
This shortage of Settlement Meters impacts on new connections and fault resolution in both the Supplier Volume Allocation (SVA) and Central Volume Allocation (CVA) markets, and consequently impacts the integrity and accuracy of Settlement.
BSC Sandbox Consultation BSB003: application by Good Energy – 15 August 2022Read More
Elexon has issued a public industry consultation for BSC Parties and interested Third Parties to seek views on the impacts on Parties relating to the implementation of a BSC Sandbox Application by Good Energy.
Good Energy have raised a BSC Sandbox request for a derogation against the BSC provisions preventing them from appointing different Supplier Agents for Import / Export Metering Systems where Data Communications Company (DCC) enabled Smart Meters are installed. This will allow them to remove a barrier preventing the use of Export Metering System IDs (MSIDs) for small-scale micro generation.
Consultation: Credit Assessment Price increase to £435/MWh from 7 September 2022Read More
This page gives details of a consultation on revising the Credit Assessment Price (CAP) to £435/MWh from 7 September 2022. This two-day consultation will close at 17:00 on 22 August 2022.
Outcome
The Credit Committee has decided to withdraw the notified CAP of £510/MWh before implementation on 7 September 2022. This means the current CAP value of £415/MWh remains valid at least until it is replaced by the next scheduled CAP of £475/MWh on 16 September.
- Elexon Circular EL03667
On 7 September, the CAP value will increase to £510/MWh. As a result, Parties may notice a change in their Credit Cover Percentage and should review the amount of Credit Cover lodged.
A Consultation paper on the value of the CAP was issued on 18 August as part of the alternative CAP review process. BSC Parties were invited to indicate whether they agreed with the proposal to increase the value of the CAP to £435/MWh effective from 7 September.
- Elexon Circular EL03654
Withdrawing the CAP of £510/MWh resulting in CAP staying at £415/MWh
The Credit Committee has decided to withdraw the notified Credit Assessment Price (CAP) of £510/MWh before implementation on 7 September 2022. This means the current CAP value of £415/MWh remains valid at least until it is replaced by the next scheduled CAP of £475/MWh on 16 September.