List of homepage news articles
This page lists all of the news articles we have produced over the last year. Any news articles older than 1 year are removed from the website as they will have concluded their designated lifecycle. Please contact us if you are looking for specific information on any subjects we have covered.
How we’re helping to spot GSP metering errors sooner
In the past eight years, we have identified five Grid Supply Point (GSP) Metering errors, equal to around 1.4% of the total number of GSP Meters. These errors have caused energy to be recorded incorrectly. As any unaccounted energy is allocated to BSC Parties through GSP Group Correction and Transmission Losses, such metering errors can present a large impact on the allocation of energy and therefore the accuracy of Trading Charges to BSC Parties.
We are publishing a beta version of our GSP change-point detection model to gather feedback from participants and help us identify other areas where central analytics and reporting could support industry in mitigating risks to Settlement.
Ending the ‘Coronavirus Disapplication Period’ for Supplier Charges
On 12 May, we issued BSC Circular EL03581, which gave notice to BSC Parties that the ‘Coronavirus Disapplication Period’ for Supplier Charges will be ending. This means that, from September 2022, Supplier Charges for SP08 will be reapplied from the September Performance Assurance Reporting and Monitoring System (PARMS) Reporting Period.
Elexon to partner with Icebreaker One to provide Net Zero data
Elexon will be joining forces with industry not-for-profit Icebreaker One as part of their government-supported Open Energy programme, which seeks to revolutionise the way data is shared across the energy sector to make sure the UK achieves its Net Zero goals.
Ofgem confirms Elexon as the Capacity Market Advisory Group secretariat
We are delighted that today, 9 May, Ofgem confirmed its decision to appoint Elexon as the independent Capacity Market Advisory Group (CMAG) secretariat, subject to a BSC Modification being raised and approved to enable us to do the work.
Metering Dispensation consultation on remaining Class 2 Meters and Class 0.5 CTRead More
We are seeking views from BSC Parties on whether they support the proposed Metering Dispensation (D/544). This Metering Dispensation is giving the affected parties’ time to use up old existing stocks of Class 2 Meters and Class 0.5 CT’s.
Consultation: Credit Assessment Price decrease to £177/MWh from 17 May 2022Read More
This page gives details of a consultation on decreasing the Credit Assessment Price (CAP) to £177/MWh from the current CAP value of £215/MWh. This two-day consultation will close at 17:00 on 28 April 2022.
Outcome
On Tuesday 17 May 2022, the CAP value will decrease to £177/MWh from the current CAP of £215/MWh. As a result, Parties may notice a change in their Credit Cover Percentage and should review the amount of Credit Cover lodged.
- Elexon Circular EL03573
Do you need support to prepare for Asset Metering (Modification P375)?
On 30 June 2022, Elexon will implement Modification P375 ‘Settlement of Secondary BM Units using metering behind the site Boundary Point‘. This is a major change to the Wholesale Electricity Trading Arrangements, which supports Net Zero by creating more opportunities for smaller asset owners to provide balancing services.
Second BSC Sandbox trial to increase opportunities for flexibility services will launch in September
Centrica is due to begin a trial this September where controllable storage heaters will provide demand-side response (DSR) when needed, by dialling down their demand.
It is the second trial which has been approved by Ofgem to use Elexon’s Balancing and Settlement Code (BSC) Sandbox. The Sandbox allows innovators to trial concepts in a live market environment without having to meet all the usual BSC rules.
Elexon views about decisions on the Future System Operator role and the codes review
Today the Department for Energy Department for Business, Energy and Industrial Strategy (BEIS) and Ofgem jointly responded to the consultations they published in July 2021 on a Future System Operator (FSO), and reforming the energy codes. National Grid ESO will move away from National Grid plc and become an independent, publicly owned FSO.
As part of that process there will also be a consultation on the ownership of Elexon, which is currently owned by National Grid ESO.
Ofgem confirms Elexon will operate key IT data platform to support MHHS
Yesterday (21 April) Ofgem confirmed that the Balancing and Settlement Code will be used to govern and fund the new Data Integration Platform (DIP) to support Market-wide Half Hourly Settlement (MHHS). This means that Elexon will manage the DIP service provider, which is currently being procured through the MHHS Programme.