List of homepage news articles

This page lists all of the news articles we have produced over the last year. Any news articles older than 1 year are removed from the website as they will have concluded their designated lifecycle. Please contact us if you are looking for specific information on any subjects we have covered.

(Showing items 51-55 of 422)

Show 5 | 10 | 20 | All
View P469 Report Phase Consultation on Credit Default ECVNs Refuse and Rejection Periods

P469 Report Phase Consultation on Credit Default ECVNs Refuse and Rejection PeriodsRead More

P469 proposal seeks to delay the Credit Default Refusal and Rejection Periods. This change would give parties a two-hour window from the Level 2 Credit Default notification until the time when any Energy Contract Volume Notifications (ECVN) related to a defaulting party are rejected.

To implement the proposed Solution, this Modification aims to change BSC Section M, 3.3.3 a (i) and (ii).

View P476 Report Phase Consultation on Exemption from MHHS Requirements for Smart Market Segment Supplier Qualification

P476 Report Phase Consultation on Exemption from MHHS Requirements for Smart Market Segment Supplier QualificationRead More

P476 seeks to allow the Performance Assurance Board to have the authority to exempt Suppliers from Smart Segment Qualification obligations. This would allow a Supplier operating in the advanced market segment (that does not have the system, processes or controls in place to meet these obligations) without a specific cost associated to be exempted from Design, Test and Build.

View P475 Report Phase Consultation on Allowing All Storage Sites to set and fix their own Production/Consumption Flags

P475 Report Phase Consultation on Allowing All Storage Sites to set and fix their own Production/Consumption FlagsRead More

The purpose of this Modification is to address the issue of storage BM Units flipping between Production (P) and Consumption (C) statuses. This flipping leads to significant financial challenges for parties managing large storage units. The proposal seeks to allow storage BM Units to fix their P/C status, thereby mitigating these challenges.

View Elexon publishes its first Digitalisation Strategy and Action Plan to support Net Zero

Elexon publishes its first Digitalisation Strategy and Action Plan to support Net Zero

Source: Elexon Corporate Website

This is a key enabler for demand-side response and flexibility needed to achieve a Net Zero energy system.

Read More
View Respond to our MHHS Qualification Consultations

Respond to our MHHS Qualification Consultations

The MHHS Programme and Code Bodies have published documents for consultation. The deadline for all documents listed below is 17:00 on Friday 19 July.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.