{"id":188640,"date":"2022-08-24T16:59:18","date_gmt":"2022-08-24T15:59:18","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=smg-issue&#038;p=188640"},"modified":"2024-12-09T10:42:33","modified_gmt":"2024-12-09T10:42:33","slug":"issue-103","status":"publish","type":"smg-issue","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/smg-issue\/issue-103\/","title":{"rendered":"Issue 103 Meter Registrants and Settlement Risk"},"content":{"rendered":"","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-188640","smg-issue","type-smg-issue","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":188640,"title":"Issue 103 Meter Registrants and Settlement Risk","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/smg-issue\/issue-103\/","categories":[],"tags":[],"content":"\n\t<div class=\"panel-content\">\n\t\t<p>The Proposer believes that there would be value in reviewing existing controls for Settlement error prevention. It is critical to the Proposer that we address these problems prior to the Settlement timetable being shortened by Market-wide Half Hourly Settlement (MHHS) as the opportunities to readdress will be reduced thereafter.<\/p>\n\n\t<\/div>\n\n<div class=\"panel-content\">\n\t\n\t<div class=\"panel-section\">\n\t\t\t\t\t<div class=\"panel-section\">\n\t\t\t\t<div class=\"accordion\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-group\">\n\t\t\t\t\t\t\t<h2 class=\"accordion-title\" tabindex=\"0\" id=\"timetable\" aria-expanded=\"false\">Timetable<\/h2>\n\t\t\t\t\t\t\t<div class=\"accordion-panel\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t<div class=\"panel-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<table style=\"border-collapse: collapse; width: 100%;\">\n<tbody>\n<tr>\n<td style=\"width: 49.9392%;\"><strong>Event<\/strong><\/td>\n<td style=\"width: 49.9392%;\"><strong>Date<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 49.9392%;\">Issue 103 was raised by Western Power Distribution<\/td>\n<td style=\"width: 49.9392%;\">24 August 2022<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 49.9392%;\">Workgroup 1<\/td>\n<td style=\"width: 49.9392%;\">14 October 2022<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 49.9392%;\">Workgroup 2<\/td>\n<td style=\"width: 49.9392%;\">7 November 2022<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 49.9392%;\">Workgroup 3<\/td>\n<td style=\"width: 49.9392%;\">12 December 2022<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 49.9392%;\">Workgroup 4<\/td>\n<td style=\"width: 49.9392%;\">10 March 2023<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 49.9392%;\">Workgroup 5<\/td>\n<td style=\"width: 49.9392%;\">TBC<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 49.9392%;\">Present Issue Report to Panel<\/td>\n<td style=\"width: 49.9392%;\">TBC<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&#xA0;<\/p>\n\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-group\">\n\t\t\t\t\t\t\t<h2 class=\"accordion-title\" tabindex=\"0\" id=\"assessment\" aria-expanded=\"false\">Assessment<\/h2>\n\t\t\t\t\t\t\t<div class=\"accordion-panel\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t<div class=\"panel-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p>Workgroup meeting documents such as agendas, slide packs, and meeting summaries, can be found on the webpage for each Workgroup meeting linked below.<\/p>\n<p>The&#xA0;<a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/meeting\/issue-103-workgroup-1\/\" data-wpel-link=\"internal\">first Issue 103 meeting<\/a> was held on 14 October 2022 where additional controls to be included to mitigate Settlement errors, and customer consumption monitoring were discussed.<\/p>\n<p>The <a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/meeting\/issue-103-workgroup-2\/\">second Issue 103 meeting<\/a> was held on 7 November 2022 where there was discussion around who has operational influence and responsibility of works on Metering Systems at GSP sites and who is best placed to ensure overall Metering System accuracy.<\/p>\n<p>The <a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/meeting\/issue-103-workgroup-3\/\">third Issue 103 meeting<\/a> was held 12 December 2022 where the group discussed the current allocation of responsibilities for Settlement metering and Line Loss Factors.<\/p>\n<p>The <a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/meeting\/issue-103-workgroup-4\/\">fourth Issue 103 meeting<\/a> was held on 10 March 2023 where the group discussed SVAA tolerance checks, CVA data estimation, and the BSC audit.&#xA0;<\/p>\n<p>The fifth Issue 103 meeting will be held once the final actions have been progressed by Elexon.&#xA0;<\/p>\n\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"accordion-group\">\n\t\t\t\t\t\t\t<h2 class=\"accordion-title\" tabindex=\"0\" id=\"submission\" aria-expanded=\"false\">Submission<\/h2>\n\t\t\t\t\t\t\t<div class=\"accordion-panel\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t\t<div class=\"panel-inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p>Issue 103 was raised by Western Power Distribution 24 August 2022.&#xA0;<\/p>\n\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t<\/div>\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/smg-issue\/188640","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/smg-issue"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/smg-issue"}],"version-history":[{"count":19,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/smg-issue\/188640\/revisions"}],"predecessor-version":[{"id":213333,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/smg-issue\/188640\/revisions\/213333"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=188640"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=188640"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}