{"id":42098,"date":"2013-07-19T16:55:10","date_gmt":"2013-07-19T15:55:10","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=release&#038;p=42098"},"modified":"2021-08-24T10:14:53","modified_gmt":"2021-08-24T09:14:53","slug":"november-2013-release","status":"publish","type":"release","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/release\/november-2013-release\/","title":{"rendered":"November 2013 Release"},"content":{"rendered":"","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-42098","release","type-release","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":42098,"title":"November 2013 Release","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/release\/november-2013-release\/","categories":[],"tags":[],"content":"\n\n\n<div class=\"panel-content\">\n\t\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section panel-content scope-of-the-release\">\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t<h2>Scope of the Release<\/h2><p>The final scope of the November 2013 Release is one Approved Modification and eight approved Change Proposals and an upgrade to the technology used by the BSC Central Systems, which will be delivered in 2 parts.<\/p>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/mod-proposal\/p296\/\" target=\"_blank\">P296<\/a>&#xA0;Introduction of a &#x2018;Fast Track&#x2019; Modification Process following the outcomes of the Code Governance Review (Phase 2)<\/p>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/change-proposal\/cp1360-inclusion-of-audit-records-for-gross-volume-correction-and-dummy-meter-exchanges\/\" target=\"_blank\">CP1360<\/a>&#xA0;Inclusion of Audit Records for GVC &amp; DMX<\/p>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/change-proposal\/cp1384\/\" target=\"_blank\">CP1384<\/a>&#xA0;Clarification on disconnection and associated processes<\/p>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/change-proposal\/cp1385\/\" target=\"_blank\">CP1385<\/a>&#xA0;Notification of NHH Energisation Status Change by LDSO<\/p>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/change-proposal\/cp1387\/\" target=\"_blank\">CP1387<\/a>&#xA0;Clarifications to the guidance and requirements for PARMS data submissions and reporting contained in BSCP533 and Appendices<\/p>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/change-proposal\/cp1389\/\" target=\"_blank\">CP1389<\/a>&#xA0;Removal of Lux Meter Requirement for PECU Arrays<\/p>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/change-proposal\/cp1390\/\" target=\"_blank\">CP1390<\/a>&#xA0;New MDD Entity for SMETS Version<\/p>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/change-proposal\/cp1391\/\" target=\"_blank\">CP1391<\/a>&#xA0;Clarify the existing MDD registration criteria for new Suppliers within the MDD (BSCP509) and Qualification (BSCP537) procedures<\/p>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/change-proposal\/cp1399\/\" target=\"_blank\">CP1399&#xA0;<\/a>Business Process Operations (BPO) Service re-branding<\/p>\n<p>&#xA0;<\/p>\n\n\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\n\t\t\n\t\t\t\t\t\t\t<div class=\"accordion key-dates-table\">\n\t\t\t\t\t<div class=\"accordion-group\">\n\t\t\t\t\t\t\t\t\t\t\t\t<h2 class=\"accordion-title\" id=\"key-dates\" tabindex=\"0\" aria-expanded=\"false\">Key dates<\/h2>\n\t\t\t\t\t\t<div class=\"accordion-panel\" aria-hidden=\"true\">\n\t\t\t\t\t\t\t<div class=\"panel-inner\">\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t<p>There are no documents to be produced for the November 2013 Release that require industry review and committee&#xA0;approval.<\/p>\n\n\t\t\t\t\t\t\t\t\t\t<table width=\"100%\" border=\"0\" cellspacing=\"0\" cellpadding=\"0\" class=\"keydates\">\n\t\t\t\t\t\t\t\t\t\t\t<thead>\n\t\t\t\t\t\t\t\t\t\t\t\t<tr>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<td class=\"activity\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p><strong>Activity<\/strong><\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<td class=\"activity-date\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p><strong>Date<\/strong><\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/td>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/tr>\n\t\t\t\t\t\t\t\t\t\t\t<\/thead>\n\t\t\t\t\t\t\t\t\t\t\t<tbody>\n\t\t\t\t\t\t\t\t\t\t\t\t<tr class=\"keydates_list\"><td class=\"activity\"><p>BSC Agent Downtime 1 to deploy Technology Changes to BSC Central Systems<\/p><\/td><\/tr><tr class=\"keydates_list\"><td class=\"activity\"><p>Release Implementation Date<\/p><\/td><\/tr><tr class=\"keydates_list\"><td class=\"activity\"><p>BSC Agent Downtime 2 to deploy Technology Changes to BSC Central Systems<\/p><\/td><\/tr>\t\t\t\t\t\t\t\t\t\t\t<\/tbody>\n\t\t\t\t\t\t\t\t\t\t<\/table>\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section panel-content basic-content\">\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t<p>The Impact Matrix lists all Code Subsidiary Documents and Configurable Items which are impacted by the Release and, the Modifications and CPs in the Release and shows which Modifications and CP(s) impact which documents.<\/p>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-content\/uploads\/2013\/10\/Nov-13-Impact-Matrix-for-Web-v5.pdf\" target=\"_blank\">November 2013 Release Impact Matrix<\/a><\/p>\n\n\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\n\t\t\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section panel-content basic-content\">\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t<h2>Nov 13 Documents to be amended as part of the release<\/h2><p>No Code Subsidiary Documents and Configurable Items, other than those approved with the relevant Modification or Change Proposal(s), will be amended as part of the November2013 Release<\/p>\n<p>The Guidance documents below will be amended for the November 2013 Release:<\/p>\n<p>&#xB7; Guidance Note: MDD Made Easy (CP1390)<\/p>\n<p>&#xB7; Guidance Note: MDD Handbook&#xA0;(CP1390)<\/p>\n<p>&#xB7; Guidance Note: GVC Correction (CP1360 v2.0)<\/p>\n\n\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\n\t\t\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"panel-section panel-content basic-content-with-document-list\">\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\n\t\t\t<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/release\/42098","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/release"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/release"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/release\/42098\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=42098"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=42098"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}