{"id":151945,"date":"2020-07-02T16:43:59","date_gmt":"2020-07-02T15:43:59","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?page_id=151945"},"modified":"2020-07-09T16:10:38","modified_gmt":"2020-07-09T15:10:38","slug":"033-cva-risk-interconnector-administrator-data-submission","status":"publish","type":"page","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/reference\/performance-assurance\/performance-assurance-processes\/performance-assurance-risk-evaluation-register\/033-cva-risk-interconnector-administrator-data-submission\/","title":{"rendered":"033 CVA Risk: Interconnector Administrator Data Submission"},"content":{"rendered":"<h2 id=\"how-it-relates-to-you\">How it relates to you<\/h2>\n<h3>Parties responsible for risk factors<\/h3>\n<ul>\n<li>Non-Performance Assurance Parties<\/li>\n<\/ul>\n<h3>Parties responsible for risk controls<\/h3>\n<ul>\n<li>Non-Performance Assurance Parties<\/li>\n<\/ul>\n<h2 id=\"potential-causes\">Potential causes<\/h2>\n<p>Potential causes, or as they known in the Risk Evaluation Register: Risk Factors are the points of failure that could result in erroneous or estimated data entering Settlement.<\/p>\n<p>Elexon has identified a number of typical failure points related to this risk, parties should note the list is non-exhaustive, and not all risk factors are applicable to every role type.<\/p>\n<ul>\n<li>Interconnector Administrator failing to submit data e.g. system\/network outage or delay in IA counterparty validating Interconnector Deemed Metered Volume (IDMV) data.<\/li>\n<li>Interconnector Administrator submits errorneous files to the SAA&#xA0; (e.g. de-registered BM Units \/ incorrect file sequence numbering \/ file structure issues)<\/li>\n<li>Not performing or completing Qualification<\/li>\n<\/ul>\n<h2 id=\"potential-solutions\">Potential solutions<\/h2>\n<p>Parties responsible for operating controls should take note of the information below. This identifies the BSC Sections and Procedures relating the risk.<\/p>\n<p>Review the processes outlined in the following documents and ensure that internal processes match the requirements:<\/p>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/bsc-codes\/bscps\/bscp504\/\">BSCP504: Non-Half Hourly Data Collection for SVA Metering Systems Registered in SMRS<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/performance-assurance\/processes\/risk-methodology-033-cva-metered-volumes-for-interconnectors\/\">RESI R033 Interconnector Administrator Data Submission<\/a><\/li>\n<\/ul>\n<h2 id=\"impact-of-this-risk-on-the-industry\">Impact of this risk on the industry<\/h2>\n<ul>\n<li>Impact: &#xA3;81.5K<\/li>\n<li>Upper Impact: &#xA3;845K<\/li>\n<li>Volatility: Medium<\/li>\n<\/ul>\n<p>In order to calculate the impact this risk has on your Party, multiply your market share by the impact as outlined above.<\/p>\n<h2 id=\"further-information\">Further information<\/h2>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/reference\/performance-assurance\/performance-assurance-processes\/performance-assurance-risk-evaluation-register\/\">Risk Evaluation Register<\/a> sets out further detailed information on the noted controls. Details can be found under Associated Documents.&#xA0;<\/p>\n<h2 id=\"support-and-training\">Support and training<\/h2>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/about\/elexon-key-contacts\/operational-support-managers-osms\/\">Operational Support Managers<\/a>&#xA0;(OSMs) are able to help with further information or training on this risk and associated processes.<\/p>\n<h2 id=\"methodology-used-for-this-risk\">Methodology used for this risk<\/h2>\n<p>The following documents outline the methodology used to assess the Settlement Risk related to Agent appointments.<\/p>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/performance-assurance\/processes\/risk-methodology-033-cva-metered-volumes-for-interconnectors\/\" data-wpel-link=\"internal\">Risk Methodology Risk 33: Metered Volumes for Interconnectors<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/reference\/performance-assurance\/performance-assurance-techniques\/\" data-wpel-link=\"internal\">More on Techniques, Timetable and Methodology<\/a><\/li>\n<\/ul>\n\n","protected":false},"excerpt":{"rendered":"<p>How it relates to you Parties responsible for risk factors Non-Performance Assurance Parties Parties responsible for risk controls Non-Performance Assurance Parties Potential causes Potential causes, or as they known in [&hellip;]<\/p>\n","protected":false},"author":365,"featured_media":0,"parent":113909,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false,"footnotes":""},"tags":[],"class_list":["post-151945","page","type-page","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":151945,"title":"033 CVA Risk: Interconnector Administrator Data Submission","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/reference\/performance-assurance\/performance-assurance-processes\/performance-assurance-risk-evaluation-register\/033-cva-risk-interconnector-administrator-data-submission\/","categories":[],"tags":[],"content":"    <div class=\"panel-content\">\n        <p>This page outlines the Risk that an Interconnector Administrator does not submit, or submits inaccurate BM Unit Metered Volume data.<\/p>\n\n    <\/div>\n\n    <div class=\"panel-content\">\n        <h2 id=\"how-it-relates-to-you\">How it relates to you<\/h2>\n<h3>Parties responsible for risk factors<\/h3>\n<ul>\n<li>Non-Performance Assurance Parties<\/li>\n<\/ul>\n<h3>Parties responsible for risk controls<\/h3>\n<ul>\n<li>Non-Performance Assurance Parties<\/li>\n<\/ul>\n<h2 id=\"potential-causes\">Potential causes<\/h2>\n<p>Potential causes, or as they known in the Risk Evaluation Register: Risk Factors are the points of failure that could result in erroneous or estimated data entering Settlement.<\/p>\n<p>Elexon has identified a number of typical failure points related to this risk, parties should note the list is non-exhaustive, and not all risk factors are applicable to every role type.<\/p>\n<ul>\n<li>Interconnector Administrator failing to submit data e.g. system\/network outage or delay in IA counterparty validating Interconnector Deemed Metered Volume (IDMV) data.<\/li>\n<li>Interconnector Administrator submits errorneous files to the SAA&#xA0; (e.g. de-registered BM Units \/ incorrect file sequence numbering \/ file structure issues)<\/li>\n<li>Not performing or completing Qualification<\/li>\n<\/ul>\n<h2 id=\"potential-solutions\">Potential solutions<\/h2>\n<p>Parties responsible for operating controls should take note of the information below. This identifies the BSC Sections and Procedures relating the risk.<\/p>\n<p>Review the processes outlined in the following documents and ensure that internal processes match the requirements:<\/p>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/bsc-codes\/bscps\/bscp504\/\">BSCP504: Non-Half Hourly Data Collection for SVA Metering Systems Registered in SMRS<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/performance-assurance\/processes\/risk-methodology-033-cva-metered-volumes-for-interconnectors\/\">RESI R033 Interconnector Administrator Data Submission<\/a><\/li>\n<\/ul>\n<h2 id=\"impact-of-this-risk-on-the-industry\">Impact of this risk on the industry<\/h2>\n<ul>\n<li>Impact: &#xA3;81.5K<\/li>\n<li>Upper Impact: &#xA3;845K<\/li>\n<li>Volatility: Medium<\/li>\n<\/ul>\n<p>In order to calculate the impact this risk has on your Party, multiply your market share by the impact as outlined above.<\/p>\n<h2 id=\"further-information\">Further information<\/h2>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/reference\/performance-assurance\/performance-assurance-processes\/performance-assurance-risk-evaluation-register\/\">Risk Evaluation Register<\/a> sets out further detailed information on the noted controls. Details can be found under Associated Documents.&#xA0;<\/p>\n<h2 id=\"support-and-training\">Support and training<\/h2>\n<p><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/about\/elexon-key-contacts\/operational-support-managers-osms\/\">Operational Support Managers<\/a>&#xA0;(OSMs) are able to help with further information or training on this risk and associated processes.<\/p>\n<h2 id=\"methodology-used-for-this-risk\">Methodology used for this risk<\/h2>\n<p>The following documents outline the methodology used to assess the Settlement Risk related to Agent appointments.<\/p>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/performance-assurance\/processes\/risk-methodology-033-cva-metered-volumes-for-interconnectors\/\" data-wpel-link=\"internal\">Risk Methodology Risk 33: Metered Volumes for Interconnectors<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/reference\/performance-assurance\/performance-assurance-techniques\/\" data-wpel-link=\"internal\">More on Techniques, Timetable and Methodology<\/a><\/li>\n<\/ul>\n\n    <\/div>\n\n","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/pages\/151945","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/users\/365"}],"replies":[{"embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/comments?post=151945"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/pages\/151945\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/pages\/113909"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=151945"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=151945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}