{"id":60438,"date":"2015-11-09T16:39:07","date_gmt":"2015-11-09T16:39:07","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=60438"},"modified":"2021-03-24T15:53:22","modified_gmt":"2021-03-24T15:53:22","slug":"de-rated-margin-forecast","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/de-rated-margin-forecast\/","title":{"rendered":"De-Rated Margin forecast"},"content":{"rendered":"<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>In respect of each Settlement Period, the NETSO shall send to the BMRA the De-Rated Margin Forecast calculated in accordance with the Loss of Load Probability Calculation Statement as a minimum (and may send more frequently):<\/p>\n<ul>\n<li>(a) at 1200 hours on each calendar day for all Settlement Periods for which Gate<br>\nClosure has not yet passed and which occur within the current Operational Day<br>\nor the following Operational Day; and<\/li>\n<li>(b) at eight, four, two and one hour(s) prior to the beginning of the Settlement<br>\nPeriod to which the De-Rated Margin Forecast relates.<\/li>\n<\/ul>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-q-balancing-services-activities\/\">BSC Section Q &#x2013; Balancing Services Activity<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/bsc-codes\/bsc-sections\/bsc-section-x-2-technical-glossary\/\">BSC Section X, Annex X-2<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/settlement-period\/\" data-wpel-link=\"internal\">Settlement Period<\/a><\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-60438","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":60438,"title":"De-Rated Margin forecast","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/de-rated-margin-forecast\/","categories":[],"tags":[],"content":"\n\n\n<div class=\"panel-content\">\n\t<p>For each Settlement Period, the National Electricity Transmission System Operator (NETSO) sends the BMRA the De-Rated Margin Forecast calculated in accordance with the Loss of Load Probability Calculation<br>\nStatement.<\/p>\n\n\t<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>In respect of each Settlement Period, the NETSO shall send to the BMRA the De-Rated Margin Forecast calculated in accordance with the Loss of Load Probability Calculation Statement as a minimum (and may send more frequently):<\/p>\n<ul>\n<li>(a) at 1200 hours on each calendar day for all Settlement Periods for which Gate<br>\nClosure has not yet passed and which occur within the current Operational Day<br>\nor the following Operational Day; and<\/li>\n<li>(b) at eight, four, two and one hour(s) prior to the beginning of the Settlement<br>\nPeriod to which the De-Rated Margin Forecast relates.<\/li>\n<\/ul>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-q-balancing-services-activities\/\">BSC Section Q &#x2013; Balancing Services Activity<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/bsc-codes\/bsc-sections\/bsc-section-x-2-technical-glossary\/\">BSC Section X, Annex X-2<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/settlement-period\/\" data-wpel-link=\"internal\">Settlement Period<\/a><\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/60438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/60438\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=60438"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=60438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}