{"id":4179,"date":"2012-01-25T16:50:08","date_gmt":"2012-01-25T16:50:08","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=4179"},"modified":"2024-10-14T12:23:56","modified_gmt":"2024-10-14T11:23:56","slug":"interconnector-bm-unit","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/interconnector-bm-unit\/","title":{"rendered":"Interconnector BM Unit"},"content":{"rendered":"<p>If you register to use a particular Interconnector, you will be assigned both a Production and a Consumption BM Unit for that Interconnector.<\/p>\n<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>A notional BM Unit associated with an Interconnector; and an Interconnector BM Unit shall be treated as a BM Unit for all purposes of the Code. has the meaning given to that term in Section K5.5.1;<\/p>\n<h2 id=\"bsc-documentation\">BSC documentation<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/bsc\/bsc-section-k-classification-and-registration-of-metering-systems-and-bm-units\">BSC Section K: Classification and Registration of Metering Systems and BM Units<\/a><\/li>\n<\/ul>\n<h2 id=\"further-information\">Further information<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/guidance-notes\/bsc-interconnector-trading\">Guidance Note on BSC Interconnector Trading<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/operational\/balancing-mechanism-units\/\">About Balancing Mechanism Units<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/interconnector\/\">Interconnector<\/a><\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-4179","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":4179,"title":"Interconnector BM Unit","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/interconnector-bm-unit\/","categories":[],"tags":[],"content":"\n\n\n<div class=\"panel-content\">\n\t<p>Interconnector BM Units allow parties to trade over a particular Interconnector. Interconnector BM Units always come in pairs: A Production BM Unit for electricity entering the GB Total System; and&#xA0;A Consumption BM Unit for electricity being taken off the GB Total System.<\/p>\n\n\t<p>If you register to use a particular Interconnector, you will be assigned both a Production and a Consumption BM Unit for that Interconnector.<\/p>\n<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>A notional BM Unit associated with an Interconnector; and an Interconnector BM Unit shall be treated as a BM Unit for all purposes of the Code. has the meaning given to that term in Section K5.5.1;<\/p>\n<h2 id=\"bsc-documentation\">BSC documentation<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/bsc\/bsc-section-k-classification-and-registration-of-metering-systems-and-bm-units\">BSC Section K: Classification and Registration of Metering Systems and BM Units<\/a><\/li>\n<\/ul>\n<h2 id=\"further-information\">Further information<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/guidance-notes\/bsc-interconnector-trading\">Guidance Note on BSC Interconnector Trading<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/operational\/balancing-mechanism-units\/\">About Balancing Mechanism Units<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/interconnector\/\">Interconnector<\/a><\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/4179","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":1,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/4179\/revisions"}],"predecessor-version":[{"id":211837,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/4179\/revisions\/211837"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=4179"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=4179"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}