{"id":4175,"date":"2012-01-25T16:49:28","date_gmt":"2012-01-25T16:49:28","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=4175"},"modified":"2024-10-11T15:55:33","modified_gmt":"2024-10-11T14:55:33","slug":"interconnector","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/interconnector\/","title":{"rendered":"Interconnector"},"content":{"rendered":"<p>Each physical Interconnector has an Interconnector Administrator and an Interconnector Error Administrator, both of which are also BSC Parties.<\/p>\n<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Means Apparatus, connected to a System, for the transfer of electricity to or from the Total System from or to an External System;<\/p>\n<h2 id=\"bsc-documentation\">BSC documentation<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/bsc\/bsc-section-k-classification-and-registration-of-metering-systems-and-bm-units\">BSC Section K: Classification and Registration of Metering Systems and BM Units<\/a><\/li>\n<\/ul>\n<h2 id=\"further-information\">Further information<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/about\/interconnectors\/\">About Interconnectors<\/a><\/li>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/guidance-notes\/bsc-interconnector-trading\">Guidance Note on BSC Interconnector Trading<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/market-entry\/becoming-an-interconnector-administrator-or-interconnector-error-administrator\/\">Becoming an Interconnector Administrator or Interconnector Error Administrator<\/a><\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-4175","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":4175,"title":"Interconnector","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/interconnector\/","categories":[],"tags":[],"content":"\n\n\n<div class=\"panel-content\">\n\t<p>An interconnector is a high-voltage cable that connects the electricity systems of neighbouring countries or regions. These interconnectors allow for the trading of electricity between different markets, enabling the transfer of surplus energy from one area to another.<\/p>\n\n\t<p>Each physical Interconnector has an Interconnector Administrator and an Interconnector Error Administrator, both of which are also BSC Parties.<\/p>\n<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Means Apparatus, connected to a System, for the transfer of electricity to or from the Total System from or to an External System;<\/p>\n<h2 id=\"bsc-documentation\">BSC documentation<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/bsc\/bsc-section-k-classification-and-registration-of-metering-systems-and-bm-units\">BSC Section K: Classification and Registration of Metering Systems and BM Units<\/a><\/li>\n<\/ul>\n<h2 id=\"further-information\">Further information<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/about\/interconnectors\/\">About Interconnectors<\/a><\/li>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/guidance-notes\/bsc-interconnector-trading\">Guidance Note on BSC Interconnector Trading<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/market-entry\/becoming-an-interconnector-administrator-or-interconnector-error-administrator\/\">Becoming an Interconnector Administrator or Interconnector Error Administrator<\/a><\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/4175","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":1,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/4175\/revisions"}],"predecessor-version":[{"id":211793,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/4175\/revisions\/211793"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=4175"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=4175"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}