{"id":4121,"date":"2012-01-25T16:39:26","date_gmt":"2012-01-25T16:39:26","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=4121"},"modified":"2024-08-06T12:14:14","modified_gmt":"2024-08-06T11:14:14","slug":"indicated-generation","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/indicated-generation\/","title":{"rendered":"Indicated Generation"},"content":{"rendered":"<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>The half-hour average MW expected generation in each Settlement Period calculated as the sum of all Physical Notifications for that Settlement Period prevailing at the time of the forecast and for BM Units for which the Physical Notifications are positive, i.e. will be exporting energy.<\/p>\n<p>Data supplied by the System Operator for the day ahead and current day (a number of times each day) for publication on the BMRS, comprising the Indicated Generation for each System Zone and Settlement Period and the national Indicated Generation for each Settlement Period.<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/bsc-codes\/bsc-sections\/bsc-section-x-2-technical-glossary\/\">BSC Section X, Annex 2<\/a><\/li>\n<\/ul>\n<h2 id=\"related-term\">Related term<\/h2>\n<ul class=\"custom-list\">\n<li>\n<article id=\"glossary-4119\" class=\"post-4119 glossary type-glossary status-publish hentry\"><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/indicated-demand\/\" data-wpel-link=\"internal\">Indicated Demand<\/a><\/article>\n<\/li>\n<li>\n<article id=\"glossary-4123\" class=\"post-4123 glossary type-glossary status-publish hentry\"><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/indicated-imbalance\/\" data-wpel-link=\"internal\">Indicated Imbalance<\/a><\/article>\n<\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/settlement-period\/\">Settlement Period<\/a><\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-4121","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":4121,"title":"Indicated Generation","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/indicated-generation\/","categories":[],"tags":[],"content":"\n\t<div class=\"acronym\">\n\t\t<span><strong>Acronym:<\/strong> INDGEN<\/span>\n\t<\/div>\n\n\n<div class=\"panel-content\">\n\t<p>A forecast of Indicated Generation in the system is received each day for the following day from the System Operator. The Indicated Generation forecast for each period is the sum of all the PNs submitted for BM Units which are forecast to be exporting energy, presented as a single average MW level for the Settlement Period.<\/p>\n<p>This figure is derived by the System Operator for submission to the BMRS but is not formally defined in the Grid Code.<\/p>\n\n\t<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>The half-hour average MW expected generation in each Settlement Period calculated as the sum of all Physical Notifications for that Settlement Period prevailing at the time of the forecast and for BM Units for which the Physical Notifications are positive, i.e. will be exporting energy.<\/p>\n<p>Data supplied by the System Operator for the day ahead and current day (a number of times each day) for publication on the BMRS, comprising the Indicated Generation for each System Zone and Settlement Period and the national Indicated Generation for each Settlement Period.<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/bsc-codes\/bsc-sections\/bsc-section-x-2-technical-glossary\/\">BSC Section X, Annex 2<\/a><\/li>\n<\/ul>\n<h2 id=\"related-term\">Related term<\/h2>\n<ul class=\"custom-list\">\n<li>\n<article id=\"glossary-4119\" class=\"post-4119 glossary type-glossary status-publish hentry\"><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/indicated-demand\/\" data-wpel-link=\"internal\">Indicated Demand<\/a><\/article>\n<\/li>\n<li>\n<article id=\"glossary-4123\" class=\"post-4123 glossary type-glossary status-publish hentry\"><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/indicated-imbalance\/\" data-wpel-link=\"internal\">Indicated Imbalance<\/a><\/article>\n<\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/settlement-period\/\">Settlement Period<\/a><\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/4121","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":1,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/4121\/revisions"}],"predecessor-version":[{"id":210108,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/4121\/revisions\/210108"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=4121"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=4121"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}