{"id":333,"date":"2011-10-14T21:49:24","date_gmt":"2011-10-14T21:49:24","guid":{"rendered":"http:\/\/elexonresearch.preview4.co.uk\/?post_type=glossary&#038;p=333"},"modified":"2018-05-14T14:57:57","modified_gmt":"2018-05-14T13:57:57","slug":"acceptance-data","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/acceptance-data\/","title":{"rendered":"Acceptance Data"},"content":{"rendered":"","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-333","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":333,"title":"Acceptance Data","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/acceptance-data\/","categories":[],"tags":[],"content":"\n\n\n<div class=\"panel-content\">\n\t<p>Data (in accordance with Section Q5.3.1) to be submitted by the Transmission Company pursuant to Section Q6.2.1(e).<\/p>\n<p>Acceptance Data for a BM Unit shall comprise the following data items:<\/p>\n<ul>\n<li>a) set comprising one or more Acceptance Volume Pairs, each with a &#x2018;from&#x2019; MW level and an associated &#x2018;from&#x2019; time and a &#x2018;to&#x2019; MW level and an associated &#x2018;to&#x2019; time and where<\/li>\n<\/ul>\n<p style=\"padding-left: 30px;\">(i) the MW levels are expressed in whole MW measured from the zero point (of no energy Export or Import)<\/p>\n<p style=\"padding-left: 30px;\">(ii) the times are expressed in a whole number of minutes and the first &#x2018;from&#x2019; time is not earlier than the Bid-Offer Acceptance Time and the last &#x2018;to&#x2019; time is not later than the end of the last Settlement Period for which Gate Closure fell before the Bid-Offer Acceptance Time<\/p>\n<ul>\n<li>b) the associated Bid-Offer Acceptance Number &#x2018;k&#x2019; expressed as an integer greater than the value of k for the Acceptance Data (for that BM Unit) with the immediately preceding Bid-Offer Acceptance Time or, where any Acceptance Data exists with identical Bid-Offer Acceptance Time, greater than the highest value of k which exists with such Bid-Offer Acceptance Time<\/li>\n<li>c) the associated Bid-Offer Acceptance Time<\/li>\n<li>d) in the case of an Acceptance within paragraph 5.1.3(b) (other than one within paragraph 5.1.5) that the Acceptance was an Emergency Acceptance<\/li>\n<li>e) in the case of an Acceptance within paragraph 5.1.3(b) (other than one within paragraph 5.1.5) whether the Transmission Company has classified such Acceptance as an &#x2018;Excluded&#x2019; Emergency Acceptance<\/li>\n<\/ul>\n\n\t<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/333\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=333"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}