{"id":2843,"date":"2012-01-16T17:07:55","date_gmt":"2012-01-16T17:07:55","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=2843"},"modified":"2024-08-08T14:51:20","modified_gmt":"2024-08-08T13:51:20","slug":"main-specified-charge","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/main-specified-charge\/","title":{"rendered":"Main Specified Charge"},"content":{"rendered":"<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Has the meaning given to that term in Section D3.1;<\/p>\n<h2 id=\"bsc-documentation\">BSC documentation<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/bsc\/bsc-section-d-bsc-cost-recovery-and-participation-charges#annex-d-3-3\">BSC Section D: BSC Cost Recovery and Participation Charges<\/a><\/li>\n<\/ul>\n<h2 id=\"further-information\">Further information<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/guidance-notes\/schedule-of-main-and-sva-specified-charges\">Guidance Note on Schedule of Main and SVA Specified Charges<\/a><\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-2843","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":2843,"title":"Main Specified Charge","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/main-specified-charge\/","categories":[],"tags":[],"content":"\n\n\n<div class=\"panel-content\">\n\t<p>The Main Specified Charges are the fixed charges associated with being a BSC Party. They are set out in BSC Annex D-3.3 and D-3.4 and are determined by the BSC Panel before the start of each BSC Year. The Main Specified Charges payable by Parties in relation to each month.<\/p>\n\n\t<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Has the meaning given to that term in Section D3.1;<\/p>\n<h2 id=\"bsc-documentation\">BSC documentation<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/bsc\/bsc-section-d-bsc-cost-recovery-and-participation-charges#annex-d-3-3\">BSC Section D: BSC Cost Recovery and Participation Charges<\/a><\/li>\n<\/ul>\n<h2 id=\"further-information\">Further information<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/guidance-notes\/schedule-of-main-and-sva-specified-charges\">Guidance Note on Schedule of Main and SVA Specified Charges<\/a><\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/2843","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":1,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/2843\/revisions"}],"predecessor-version":[{"id":210195,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/2843\/revisions\/210195"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=2843"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=2843"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}