{"id":2791,"date":"2012-01-16T16:52:29","date_gmt":"2012-01-16T16:52:29","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=2791"},"modified":"2021-03-16T15:24:59","modified_gmt":"2021-03-16T15:24:59","slug":"cva-metering-equipment","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/cva-metering-equipment\/","title":{"rendered":"CVA Metering Equipment"},"content":{"rendered":"<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Metering Equipment which is or is to be comprised in a CVA Metering System (whether or not also comprised in an Supplier Volume Allocation (SVA) Metering System).<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-x-annex-x-1-general-glossary\/\" data-wpel-link=\"internal\">BSC Section X, Annex X-1<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/cva-metering-system\/\">CVA Metering System<\/a><\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-2791","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":2791,"title":"CVA Metering Equipment","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/cva-metering-equipment\/","categories":[],"tags":[],"content":"\n\n\n<div class=\"panel-content\">\n\t<p>Metering Equipment which is in a Central Volume Allocation (CVA) Metering System.<\/p>\n\n\t<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Metering Equipment which is or is to be comprised in a CVA Metering System (whether or not also comprised in an Supplier Volume Allocation (SVA) Metering System).<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-x-annex-x-1-general-glossary\/\" data-wpel-link=\"internal\">BSC Section X, Annex X-1<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/cva-metering-system\/\">CVA Metering System<\/a><\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/2791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/2791\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=2791"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=2791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}