{"id":2783,"date":"2012-01-16T16:50:28","date_gmt":"2012-01-16T16:50:28","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=2783"},"modified":"2020-11-24T21:17:09","modified_gmt":"2020-11-24T21:17:09","slug":"credited-energy-volume","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/credited-energy-volume\/","title":{"rendered":"Credited Energy Volume"},"content":{"rendered":"<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Credited Energy Volume is the allocation of metered volume from BM Unit (i) to Energy Account a in Settlement Period (j), taking account of Transmission Loss Multipliers and applying any Metered Volume Reallocation Notices that are in force.&#xA0;<\/p>\n<p>Note that Metered Volume Percentage Reallocations are applied after subtracting the <a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/period-bm-unit-balancing-services-volume\/\">Period BM Unit Balancing Services Volume<\/a> (QBSij). The quantity determined in accordance with Section T4.5.1.<\/p>\n<h3>BSC Documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-t-settlement-and-trading-charges\/\">BSC Section T &#x2013; Settlement and Trading Charges<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/bsc-codes\/bsc-sections\/bsc-section-x-2-technical-glossary\/\" data-wpel-link=\"internal\">BSC Section X, Annex X-2<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li>\n<article id=\"glossary-12385\" class=\"post-12385 glossary type-glossary status-publish hentry\"><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/transmission-loss-factor\/\" data-wpel-link=\"internal\">Transmission Loss Factor<\/a><\/article>\n<\/li>\n<li>\n<article id=\"glossary-12388\" class=\"post-12388 glossary type-glossary status-publish hentry\"><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/transmission-loss-multiplier\/\" data-wpel-link=\"internal\">Transmission Loss Multiplier<\/a><\/article>\n<\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-2783","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":2783,"title":"Credited Energy Volume","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/credited-energy-volume\/","categories":[],"tags":[],"content":"\n\t<div class=\"acronym\">\n\t\t<span><strong>Acronym:<\/strong> QCEiaj<\/span>\n\t<\/div>\n\n\n<div class=\"panel-content\">\n\t<p>The allocation of metered volume from BM unit to Energy Account in a Settlement Period.<\/p>\n\n\t<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Credited Energy Volume is the allocation of metered volume from BM Unit (i) to Energy Account a in Settlement Period (j), taking account of Transmission Loss Multipliers and applying any Metered Volume Reallocation Notices that are in force.&#xA0;<\/p>\n<p>Note that Metered Volume Percentage Reallocations are applied after subtracting the <a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/period-bm-unit-balancing-services-volume\/\">Period BM Unit Balancing Services Volume<\/a> (QBSij). The quantity determined in accordance with Section T4.5.1.<\/p>\n<h3>BSC Documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-t-settlement-and-trading-charges\/\">BSC Section T &#x2013; Settlement and Trading Charges<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/bsc-codes\/bsc-sections\/bsc-section-x-2-technical-glossary\/\" data-wpel-link=\"internal\">BSC Section X, Annex X-2<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li>\n<article id=\"glossary-12385\" class=\"post-12385 glossary type-glossary status-publish hentry\"><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/transmission-loss-factor\/\" data-wpel-link=\"internal\">Transmission Loss Factor<\/a><\/article>\n<\/li>\n<li>\n<article id=\"glossary-12388\" class=\"post-12388 glossary type-glossary status-publish hentry\"><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/transmission-loss-multiplier\/\" data-wpel-link=\"internal\">Transmission Loss Multiplier<\/a><\/article>\n<\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/2783","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/2783\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=2783"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=2783"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}