{"id":12014,"date":"2012-02-20T22:30:45","date_gmt":"2012-02-20T22:30:45","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=12014"},"modified":"2023-09-13T12:01:47","modified_gmt":"2023-09-13T11:01:47","slug":"run-down-rates","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/run-down-rates\/","title":{"rendered":"Run-Down Rate(s)"},"content":{"rendered":"<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>The rate at which a BM Unit can run down Export or Import MW. Also a set of data supplied by the System Operator for publication on the BMRS, comprising for each BM Unit. Up to three Run-Down Rate(s), expressed in MW\/minute and associated Run-Down Elbow(s), expressed in MW for output (Export) and the same for input (Import).<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-x-annex-x-2-technical-glossary\/\">BSC Section X, Annex 2<\/a><\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-12014","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":12014,"title":"Run-Down Rate(s)","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/run-down-rates\/","categories":[],"tags":[],"content":"\n\n\n<div class=\"panel-content\">\n\t<p>The rate at which a BM Unit can run down Export or Import MW.&#xA0;<\/p>\n\n\t<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>The rate at which a BM Unit can run down Export or Import MW. Also a set of data supplied by the System Operator for publication on the BMRS, comprising for each BM Unit. Up to three Run-Down Rate(s), expressed in MW\/minute and associated Run-Down Elbow(s), expressed in MW for output (Export) and the same for input (Import).<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-x-annex-x-2-technical-glossary\/\">BSC Section X, Annex 2<\/a><\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/12014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":1,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/12014\/revisions"}],"predecessor-version":[{"id":201176,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/12014\/revisions\/201176"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=12014"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=12014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}