{"id":11864,"date":"2012-02-20T22:02:45","date_gmt":"2012-02-20T22:02:45","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=11864"},"modified":"2024-08-13T09:56:46","modified_gmt":"2024-08-13T08:56:46","slug":"production-bm-unit","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/production-bm-unit\/","title":{"rendered":"Production BM Unit"},"content":{"rendered":"<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Means a BM Unit which:<\/p>\n<p>(i) in the case of a BM Unit other than an Interconnector BM Unit, is classified as a Production BM Unit in accordance with the provisions of Section K3.5.2 or, in the case of an Exempt Export BM Unit, the Lead Party has elected to treat as a Production BM Unit pursuant to Section K3.5.5; and<\/p>\n<p>(ii) in the case of an Interconnector BM Unit, is designated by the CRA as a &#x2018;Production&#x2019; BM Unit pursuant to Section K5.5.5;<\/p>\n<h2 id=\"bsc-documentation\">BSC documentation<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/bsc\/bsc-section-k-classification-and-registration-of-metering-systems-and-bm-units\">BSC Section K: Classification and Registration of Metering Systems and BM Units<\/a><\/li>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/guidance-notes\/productionconsumption-status-and-flag\">Guidance Note on Production\/Consumption Status and Flag<\/a><\/li>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/guidance-notes\/bm-units-registration-of-balancing-mechanism-bm-units\">Guidance Note on BM Units<\/a><\/li>\n<\/ul>\n<h2 id=\"further-information\">Further information<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/operational\/balancing-mechanism-units\/\">More on Balancing Mechanism Units<\/a><\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-11864","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":11864,"title":"Production BM Unit","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/production-bm-unit\/","categories":[],"tags":[],"content":"\n\n\n<div class=\"panel-content\">\n\t<p>Each BM Unit has a Production or Consumption (P\/C) Status which, on any given Settlement Day, is either Production or Consumption. Production BM Unit refers to a Balancing Mechanism (BM) Unit that is classified as having a Production status. This means it is primarily involved in generating electricity rather than consuming it.<\/p>\n\n\t<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Means a BM Unit which:<\/p>\n<p>(i) in the case of a BM Unit other than an Interconnector BM Unit, is classified as a Production BM Unit in accordance with the provisions of Section K3.5.2 or, in the case of an Exempt Export BM Unit, the Lead Party has elected to treat as a Production BM Unit pursuant to Section K3.5.5; and<\/p>\n<p>(ii) in the case of an Interconnector BM Unit, is designated by the CRA as a &#x2018;Production&#x2019; BM Unit pursuant to Section K5.5.5;<\/p>\n<h2 id=\"bsc-documentation\">BSC documentation<\/h2>\n<ul>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/bsc\/bsc-section-k-classification-and-registration-of-metering-systems-and-bm-units\">BSC Section K: Classification and Registration of Metering Systems and BM Units<\/a><\/li>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/guidance-notes\/productionconsumption-status-and-flag\">Guidance Note on Production\/Consumption Status and Flag<\/a><\/li>\n<li><a href=\"https:\/\/bscdocs.elexon.co.uk\/guidance-notes\/bm-units-registration-of-balancing-mechanism-bm-units\">Guidance Note on BM Units<\/a><\/li>\n<\/ul>\n<h2 id=\"further-information\">Further information<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/operational\/balancing-mechanism-units\/\">More on Balancing Mechanism Units<\/a><\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/11864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":2,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/11864\/revisions"}],"predecessor-version":[{"id":210388,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/11864\/revisions\/210388"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=11864"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=11864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}