{"id":11660,"date":"2012-02-20T21:22:41","date_gmt":"2012-02-20T21:22:41","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=11660"},"modified":"2021-03-18T16:14:06","modified_gmt":"2021-03-18T16:14:06","slug":"notice-to-deliver-bids","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/notice-to-deliver-bids\/","title":{"rendered":"Notice to Deliver Bids"},"content":{"rendered":"<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Notice to Deliver Bids, expressed in minutes, indicating the notification time required for a BM Unit to start delivering Bids from the time that the Bid-Offer Acceptance is issued. Also set of data supplied by the System Operator for publication on the BMRS, comprising for each BM Unit the effective time and the notice required to deliver bids.<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-x-annex-x-2-technical-glossary\/\" data-wpel-link=\"internal\">BSC Section X, Annex 2<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/bm-unit\/\" data-wpel-link=\"internal\">BM Unit<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/bid\/\">Bid<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/bid-offer-acceptance\/\">Bid-Offer Acceptance<\/a><\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-11660","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":11660,"title":"Notice to Deliver Bids","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/notice-to-deliver-bids\/","categories":[],"tags":[],"content":"\n\t<div class=\"acronym\">\n\t\t<span><strong>Acronym:<\/strong> NTB<\/span>\n\t<\/div>\n\n\n<div class=\"panel-content\">\n\t<p>This indicates the notification time required for a BM Unit to start delivering Bids from the time that the Bid-Offer Acceptance is issued.<\/p>\n\n\t<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Notice to Deliver Bids, expressed in minutes, indicating the notification time required for a BM Unit to start delivering Bids from the time that the Bid-Offer Acceptance is issued. Also set of data supplied by the System Operator for publication on the BMRS, comprising for each BM Unit the effective time and the notice required to deliver bids.<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-x-annex-x-2-technical-glossary\/\" data-wpel-link=\"internal\">BSC Section X, Annex 2<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/bm-unit\/\" data-wpel-link=\"internal\">BM Unit<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/bid\/\">Bid<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/bid-offer-acceptance\/\">Bid-Offer Acceptance<\/a><\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/11660","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/11660\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=11660"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=11660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}