{"id":11489,"date":"2012-02-20T20:51:56","date_gmt":"2012-02-20T20:51:56","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=11489"},"modified":"2021-03-26T11:58:19","modified_gmt":"2021-03-26T11:58:19","slug":"meter-advance-reconciliation","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/meter-advance-reconciliation\/","title":{"rendered":"Meter Advance Reconciliation"},"content":{"rendered":"<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Means the process of reconciling half hourly energy values with meter advances as described (in the case of Central Volume Allocation (CVA) Metering Systems) in BSCP05 and (in the case of Supplier Volume Allocation (SVA) Metering Systems) in BSCP502.<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/bsc-codes\/bsc-sections\/bsc-section-x-1-general-glossary\/\">BSC Section X, Annex 1<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/csd\/bscp502-half-hourly-data-collection-for-sva-metering-systems-registered-in-smrs\/\">BSCP502<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/csd\/bscp05-meter-advance-reconciliation-for-central-volume-allocation\/\">BSCP05<\/a><\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-11489","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":11489,"title":"Meter Advance Reconciliation","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/meter-advance-reconciliation\/","categories":[],"tags":[],"content":"\n\t<div class=\"acronym\">\n\t\t<span><strong>Acronym:<\/strong> MAR<\/span>\n\t<\/div>\n\n\n<div class=\"panel-content\">\n\t<p>The process of reconciling half hourly energy values with meter advances.<\/p>\n\n\t<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>Means the process of reconciling half hourly energy values with meter advances as described (in the case of Central Volume Allocation (CVA) Metering Systems) in BSCP05 and (in the case of Supplier Volume Allocation (SVA) Metering Systems) in BSCP502.<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/documents\/bsc-codes\/bsc-sections\/bsc-section-x-1-general-glossary\/\">BSC Section X, Annex 1<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/csd\/bscp502-half-hourly-data-collection-for-sva-metering-systems-registered-in-smrs\/\">BSCP502<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/csd\/bscp05-meter-advance-reconciliation-for-central-volume-allocation\/\">BSCP05<\/a><\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/11489","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/11489\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=11489"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=11489"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}