{"id":11471,"date":"2012-02-20T20:47:53","date_gmt":"2012-02-20T20:47:53","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=glossary&#038;p=11471"},"modified":"2021-03-24T10:10:05","modified_gmt":"2021-03-24T10:10:05","slug":"maximum-export-limit","status":"publish","type":"glossary","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/maximum-export-limit\/","title":{"rendered":"Maximum Export Limit"},"content":{"rendered":"<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>A series of MW figures and associated times, making up a profile of the maximum level at which the BM Unit may be exporting (in MW) to the GB Transmission System at the Grid Supply Point, as appropriate. Also set of data supplied by the System Operator for publication on the BMRS, comprising for each BM Unit the effective time and the maximum Export level and a sequence number.<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-x-annex-x-2-technical-glossary\/\">BSC Section X, Annex X-2<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/grid-supply-point\/\">Grid Supply Point<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/maximum-import-limit\/\">Maximum Import Limit<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/bm-unit\/\">BM Unit<\/a><\/li>\n<\/ul>\n\n","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-11471","glossary","type-glossary","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":11471,"title":"Maximum Export Limit","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/maximum-export-limit\/","categories":[],"tags":[],"content":"\n\t<div class=\"acronym\">\n\t\t<span><strong>Acronym:<\/strong> MEL<\/span>\n\t<\/div>\n\n\n<div class=\"panel-content\">\n\t<p>A series of MW figures and associated times, making up a profile of the maximum level at which the BM Unit may be exporting (in MW) to the GB Transmission System at the Grid Supply Point.<\/p>\n\n\t<h2 id=\"bsc-defined-definition\">BSC defined definition<\/h2>\n<p>A series of MW figures and associated times, making up a profile of the maximum level at which the BM Unit may be exporting (in MW) to the GB Transmission System at the Grid Supply Point, as appropriate. Also set of data supplied by the System Operator for publication on the BMRS, comprising for each BM Unit the effective time and the maximum Export level and a sequence number.<\/p>\n<h3>BSC documentation<\/h3>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/the-bsc\/bsc-section-x-annex-x-2-technical-glossary\/\">BSC Section X, Annex X-2<\/a><\/li>\n<\/ul>\n<h2 id=\"related-terms\">Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/grid-supply-point\/\">Grid Supply Point<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/maximum-import-limit\/\">Maximum Import Limit<\/a><\/li>\n<li><a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/glossary\/bm-unit\/\">BM Unit<\/a><\/li>\n<\/ul>\n\n<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/11471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/glossary\/11471\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=11471"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=11471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}