{"id":10448,"date":"2012-02-19T11:44:47","date_gmt":"2012-02-19T11:44:47","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=dcp&#038;p=10448"},"modified":"2014-03-20T13:20:18","modified_gmt":"2014-03-20T13:20:18","slug":"dcp0008-changes-to-the-change-of-profile-class-process-set-out-in-bscp516","status":"publish","type":"dcp","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/dcp\/dcp0008-changes-to-the-change-of-profile-class-process-set-out-in-bscp516\/","title":{"rendered":"DCP0008"},"content":{"rendered":"","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-10448","dcp","type-dcp","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":10448,"title":"DCP0008","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/dcp\/dcp0008-changes-to-the-change-of-profile-class-process-set-out-in-bscp516\/","categories":[],"tags":[],"content":"\n\n<div class=\"panel-content\">\n\t\t\t<h3>Changes to the Change of Profile Class Process set out in BSCP516<\/h3>\n\t\n\t\n\t\t\t<p>A number of issues with the change of Profile Class process were identified. As a result Elexon raised CP1177 &#x2018;Changes to the change of Profile Class process as set out in BSCP516&#x2019;, which was rejected by the Supplier Volume Allocation Group (SVG) on 30 January 2007, as a number of participants had raised concerns about aspects of the CP solution. Despite these concerns participants were enthusiastic about a number of solutions set out in CP1177 v3.0. Elexon therefore recommended that a workshop be held in order to define which parts of CP1177 should be progressed. The workshop was held on 18 April 2007 and DCP0008 raised as a result.<\/p>\n<p>DCP0008 proposes to update BSCP516 to:<\/p>\n<p>&#x2013; extend the Supplier timescales for responding to the NHH Data Collectors review from 3 to 20 Working Days and update the wording of this requirement to better reflect the review process undertaken by Suppliers;<br>\n&#x2013; move the annual review from February to May;<br>\n&#x2013; add 2 mandatory fields to the P0206 flow (the current Profile Class and the value of the meter advances); and<br>\n&#x2013; move the parts of the annual Profile Class review process currently included in section 3.1 of BSCP516 to 3.2.<\/p>\n\n\t\n\t\t\t<div class=\"panel-section\">\n\t\t\t<h2>Progression<\/h2>\n\t\t\t<p>DCP0008 was raised on 8 June 2007. DCP0008 was issued for Industry Impact Assessment as part of CPC00607. DCP0008 was closed and raised as CP1208.<\/p>\n\n\t\t<\/div>\n\t<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/dcp\/10448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/dcp"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/dcp"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/dcp\/10448\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=10448"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=10448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}