{"id":10177,"date":"2012-02-19T01:06:02","date_gmt":"2012-02-19T01:06:02","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=dcp&#038;p=10177"},"modified":"2014-03-20T13:20:19","modified_gmt":"2014-03-20T13:20:19","slug":"dcp0040-submitting-meter-technical-details-to-the-technical-assurance-agent","status":"publish","type":"dcp","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/dcp\/dcp0040-submitting-meter-technical-details-to-the-technical-assurance-agent\/","title":{"rendered":"DCP0040"},"content":{"rendered":"","protected":false},"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-10177","dcp","type-dcp","status-publish","hentry"],"acf":[],"semantic_search":{"post_id":10177,"title":"DCP0040","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/dcp\/dcp0040-submitting-meter-technical-details-to-the-technical-assurance-agent\/","categories":[],"tags":[],"content":"\n\n<div class=\"panel-content\">\n\t\t\t<h3>Submitting Meter Technical Details to the Technical Assurance Agent<\/h3>\n\t\n\t\n\t\t\t<p>DCP0040 consulted on two potential solutions to provide an alternative means of submitting Meter Technical Details (MTDs) to the Technical Assurance Agent (TAA).&#xA0; The results showed that of the two solutions put forward, the preferred option was for the TAA to receive MTDs via the D0268 &#x2018;Half Hourly Meter Technical Details&#x2019; flow received through the Data Transfer Network (DTN).<\/p>\n\n\t\n\t\t\t<div class=\"panel-section\">\n\t\t\t<h2>Progression<\/h2>\n\t\t\t<p>DCP0040 was raised on 09 January 2009 and was issued for Industry Impact Assessment as part of CPC00651.&#xA0; DCP0040 was closed following discussion by the SVG, with no CP raised.&#xA0; A change to improve MTD submission will potentially form part of a more comprehensive proposal to deliver improvements by amending obligations relating to the TAA and MTDs, after further consideration by Elexon.<\/p>\n\n\t\t<\/div>\n\t<\/div>","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/dcp\/10177","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/dcp"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/dcp"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/dcp\/10177\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=10177"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=10177"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}