{"id":92177,"date":"2018-02-26T15:06:06","date_gmt":"2018-02-26T15:06:06","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=consultation&#038;p=92177"},"modified":"2020-02-07T11:17:14","modified_gmt":"2020-02-07T11:17:14","slug":"consultation-allocation-new-grid-supply-points-gsp-groups","status":"publish","type":"consultation","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/consultation-allocation-new-grid-supply-points-gsp-groups\/","title":{"rendered":"Consultation for Allocation of New Grid Supply Points to a GSP Groups"},"content":{"rendered":"","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-92177","consultation","type-consultation","status-publish","hentry","consultation_type-others","consultation_type-operations-and-settlement"],"acf":[],"semantic_search":{"post_id":92177,"title":"Consultation for Allocation of New Grid Supply Points to a GSP Groups","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/consultation-allocation-new-grid-supply-points-gsp-groups\/","categories":["Consultations for all Process, Operational and Credit areas","Consultations on Operations and Settlement"],"tags":[],"content":"\n\n\n\t<div class=\"panel-section panel-content summary\">\n\t\t<h2>Who will this impact?<\/h2>\t\t<p>Elexon has received three new GSP registrations application from the Transmission Company. &#xA0;All relate to the reconfiguration of existing assets.<\/p>\n<p><strong>Harris GSP and Stornoway GSP (North of Scotland)<\/strong><\/p>\n<p>There are two proposed new GSPs on the Scottish Western Isles, to be known as Harris GSP (GSP HARG_P) and Stornoway GSP (GSP STOR_P).<\/p>\n<p>The Transmission Company propose that both GSP HARG_P and GSP STOR_P are allocated to the North of Scotland (_P) GSP Group.<\/p>\n<p><strong>Ferrybridge (Yorkshire)<\/strong><\/p>\n<p>NPG Yorkshire (YEDB) is the current Registrant of an existing Distribution System Connection Point (DSCP) (FERRB9) at Ferrybridge B 132kV substation. NPG Yorkshire intends to de-register the DSCP and instead register these circuits as a new GSP FERRB_M to feed the Yorkshire (_M) GSP Group.<\/p>\n<p>The Transmission Company propose that GSP FERRB_M is allocated to the Yorkshire (_M) GSP Group.<\/p>\n<p><strong>Responses<\/strong><\/p>\n<p>If you have any views on the allocation of the above GSPs to GSP Groups, please respond using the consultation response form and send your responses, entitled &#x201C;<strong>Harris, Stornoway and Ferrybridge GSP Registration<\/strong>&#x201D;, to <u><a href=\"mailto:bm.unit@elexon.co.uk\">bm.unit@elexon.co.uk<\/a><\/u> by <strong>17:00 on Monday 12 March 2018<\/strong>.<\/p>\n\n\t<\/div>\n\n\n\n","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/92177","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/consultation"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/92177\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=92177"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=92177"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}