{"id":83201,"date":"2017-10-11T15:18:39","date_gmt":"2017-10-11T14:18:39","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=consultation&#038;p=83201"},"modified":"2017-12-07T18:07:16","modified_gmt":"2017-12-07T18:07:16","slug":"p356","status":"publish","type":"consultation","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/p356\/","title":{"rendered":"P356 Assessment Procedure Consultation"},"content":{"rendered":"<p>P356&#xA0;will align the BSC with Grid Code Modification GC0099, which seeks to introduce the interconnector scheduled transfer process to the Grid Code. This is in order to establish common, cross-code provisions which are compatible with both the EU single intraday market coupling processes, and GB and EU balancing processes.<\/p>\n\n","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-83201","consultation","type-consultation","status-publish","hentry","consultation_type-change","consultation_type-modification"],"acf":[],"semantic_search":{"post_id":83201,"title":"P356 Assessment Procedure Consultation","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/p356\/","categories":["Change","Modification"],"tags":[],"content":"\n\n\n\t<div class=\"panel-section panel-content summary\">\n\t\t<h2>Who will this impact?<\/h2>\t\t<p>P356&#xA0;will align the BSC with Grid Code Modification GC0099, which seeks to introduce the interconnector scheduled transfer process to the Grid Code. This is in order to establish common, cross-code provisions which are compatible with both the EU single intraday market coupling processes, and GB and EU balancing processes<\/p>\n\n\t<\/div>\n\n\n\n","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/83201","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/consultation"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/83201\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=83201"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=83201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}