{"id":33590,"date":"2012-05-02T09:28:24","date_gmt":"2012-05-02T08:28:24","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=consultation&#038;p=33590"},"modified":"2017-12-07T18:12:17","modified_gmt":"2017-12-07T18:12:17","slug":"consultation-for-allocation-of-a-new-grid-supply-point-gsp-to-a-gsp-group","status":"publish","type":"consultation","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/consultation-for-allocation-of-a-new-grid-supply-point-gsp-to-a-gsp-group\/","title":{"rendered":"Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group"},"content":{"rendered":"","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-33590","consultation","type-consultation","status-publish","hentry","consultation_type-others"],"acf":[],"semantic_search":{"post_id":33590,"title":"Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/consultation-for-allocation-of-a-new-grid-supply-point-gsp-to-a-gsp-group\/","categories":["Consultations for all Process, Operational and Credit areas"],"tags":[],"content":"\n\n\n\t<div class=\"panel-section panel-content summary\">\n\t\t<h2>Who will this impact?<\/h2>\t\t<p>Section K1.8 of the Code states that the Panel may consider revising the GSPs comprised in a Group of GSPs (including the establishment of a Group of GSPs):<\/p>\n<ul>\n<li>Where a new GSP Point is commissioned or an existing GSP Point is decommissioned; or<\/li>\n<li>Where the Panel consider it appropriate to do so.<\/li>\n<\/ul>\n<p>Scottish Power are constructing a new Grid Supply Point in East Glasgow, to be known as Dalmarnock GSP.<\/p>\n<p>The Transmission Company propose that GSP DALM3 is allocated to the South Scotland (_N) GSP Group.<\/p>\n\n\t<\/div>\n\n\n\n","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/33590","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/consultation"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/33590\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=33590"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=33590"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}