{"id":188333,"date":"2022-08-15T12:13:44","date_gmt":"2022-08-15T11:13:44","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=consultation&#038;p=188333"},"modified":"2022-09-05T11:07:04","modified_gmt":"2022-09-05T10:07:04","slug":"bsc-sandbox-consultation-s2022-03-good-energy","status":"publish","type":"consultation","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/bsc-sandbox-consultation-s2022-03-good-energy\/","title":{"rendered":"BSC Sandbox Consultation BSB003: application by Good Energy &#8211; 15 August 2022"},"content":{"rendered":"","protected":false},"featured_media":154740,"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-188333","consultation","type-consultation","status-publish","has-post-thumbnail","hentry","consultation_type-others","consultation_type-bsc"],"acf":[],"semantic_search":{"post_id":188333,"title":"BSC Sandbox Consultation BSB003: application by Good Energy &#8211; 15 August 2022","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/bsc-sandbox-consultation-s2022-03-good-energy\/","categories":["Consultations for all Process, Operational and Credit areas","Consultations on BSC and codes"],"tags":[],"content":"\n\n\n\t<div class=\"panel-section panel-content summary\">\n\t\t<h2>Who will this impact?<\/h2>\t\t<p>Elexon has issued a public industry consultation for BSC Parties and interested Third Parties to seek views on the impacts on Parties relating to the implementation of a BSC Sandbox Application by Good Energy.<\/p>\n<p>Good Energy have raised a BSC Sandbox request for a derogation against the BSC provisions preventing them from appointing different Supplier Agents for Import \/ Export Metering Systems where Data Communications Company (DCC) enabled Smart Meters are installed. This will allow them to remove a barrier preventing the use of Export Metering System IDs (MSIDs) for small-scale micro generation.<\/p>\n\n\t<\/div>\n\n\n\n","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/188333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/consultation"}],"version-history":[{"count":9,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/188333\/revisions"}],"predecessor-version":[{"id":189335,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/188333\/revisions\/189335"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media\/154740"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=188333"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=188333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}