{"id":155087,"date":"2020-09-08T09:34:45","date_gmt":"2020-09-08T08:34:45","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=consultation&#038;p=155087"},"modified":"2020-09-08T09:34:45","modified_gmt":"2020-09-08T08:34:45","slug":"consultation-for-allocation-of-a-new-grid-supply-point-gsp-to-a-gsp-group-4-september-2020","status":"publish","type":"consultation","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/consultation-for-allocation-of-a-new-grid-supply-point-gsp-to-a-gsp-group-4-september-2020\/","title":{"rendered":"Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group &#8211; 4 September 2020"},"content":{"rendered":"","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-155087","consultation","type-consultation","status-publish","hentry","consultation_type-others","consultation_type-operations-and-settlement"],"acf":[],"semantic_search":{"post_id":155087,"title":"Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group &#8211; 4 September 2020","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/consultation-for-allocation-of-a-new-grid-supply-point-gsp-to-a-gsp-group-4-september-2020\/","categories":["Consultations for all Process, Operational and Credit areas","Consultations on Operations and Settlement"],"tags":[],"content":"\n\n\n\t<div class=\"panel-section panel-content summary\">\n\t\t<h2>Who will this impact?<\/h2>\t\t<p>Scottish Hydro Electric Transmission plc (SHE-T) is connecting a new circuit to the Rothienorman 33kV substation, required as part of the East Coast 400 kV Reinforcement project. This new Systems Connection Point will be registered in Settlement as a new GSP, to be known as Rothienorman (ROTI3).<\/p>\n<p>The National Electricity Transmission System Operator (NETSO) propose that GSP_ ROTI3 is allocated to the North Scotland (_P) GSP Group.<\/p>\n<h2 id=\"responses\">Responses<\/h2>\n<p>If you have any views on the allocation of the above GSP to the North Scotland GSP Group, please respond using the consultation response form, and send to <a href=\"mailto:bm.unit@elexon.co.uk\">bm.unit@elexon.co.uk<\/a> by 17:00 on 18 September 2020.<\/p>\n\n\t<\/div>\n\n\n\n","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/155087","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/consultation"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/155087\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=155087"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=155087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}