{"id":142550,"date":"2020-01-23T14:46:41","date_gmt":"2020-01-23T14:46:41","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=consultation&#038;p=142550"},"modified":"2020-03-30T15:53:00","modified_gmt":"2020-03-30T14:53:00","slug":"consultation-for-allocation-of-a-new-grid-supply-point-gsp-to-a-gsp-group-6","status":"publish","type":"consultation","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/consultation-for-allocation-of-a-new-grid-supply-point-gsp-to-a-gsp-group-6\/","title":{"rendered":"Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group &#8211; 23 January 2020"},"content":{"rendered":"","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-142550","consultation","type-consultation","status-publish","hentry","consultation_type-operations-and-settlement"],"acf":[],"semantic_search":{"post_id":142550,"title":"Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group &#8211; 23 January 2020","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/consultation-for-allocation-of-a-new-grid-supply-point-gsp-to-a-gsp-group-6\/","categories":["Consultations on Operations and Settlement"],"tags":[],"content":"\n\n\n\t<div class=\"panel-section panel-content summary\">\n\t\t<h2>Who will this impact?<\/h2>\t\t<p>The Tongland 132kV substation currently feeds the _N GSP Group via two circuits with 132\/11kV transformers, which form the existing GSP, GSP_TONG. The existing GSP is at the 11kV substation.<\/p>\n<p>Scottish Power Energy Network (SPEN) is connecting two new circuits into the Tongland 132kV substation. The two new circuits will be connected via 132\/33kV transformers to a 33kV substation.&#xA0; The new circuits at the 33kV substation will be registered as a new GSP, to be known as Tongland_1, GSP_TONG1.<\/p>\n<p>The National Electricity Transmission System Operator (NETSO) propose that GSP_TONG1 is allocated to the South of Scotland (_N) GSP Group.<\/p>\n\n\t<\/div>\n\n\n\n","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/142550","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/consultation"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/142550\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=142550"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=142550"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}