{"id":125268,"date":"2019-06-19T15:44:07","date_gmt":"2019-06-19T14:44:07","guid":{"rendered":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/?post_type=consultation&#038;p=125268"},"modified":"2020-02-10T10:45:57","modified_gmt":"2020-02-10T10:45:57","slug":"p350-methodology-for-load-periods-and-sample-settlement-periods-consultation-19-june-2019","status":"publish","type":"consultation","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/p350-methodology-for-load-periods-and-sample-settlement-periods-consultation-19-june-2019\/","title":{"rendered":"P350: Methodology for Load Periods and Sample Settlement Periods Consultation 19 June 2019"},"content":{"rendered":"<p>Modification <a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/mod-proposal\/p350\/\">P350 &#x2018;Introduction of a seasonal Zonal Transmission Losses scheme&#x2019;<\/a> introduced a Transmission Loss Factor (TLF) for each TLF Zone and BSC Season, so transmission losses can be allocated on a geographical basis. P350 went live on 1 April 2018.<\/p>\n<p>This Consultation details the proposed methodology for setting Load Periods and Sample Settlement Periods to be used in the derivation of Zonal TLFs, as required by the Balancing and Settlement Code (BSC).<\/p>\n<p>We encourage you to respond to this consultation using the consultation pro-forma. The consultation period will end on Friday 5 July 2019 at 17:00. Please return responses to: <a href=\"mailto:market.operations@elexon.co.uk?subject=Response%20to%20P350:%20LPs%20and%20SSP%20Methodology%20Consultation\">market.operations@elexon.co.uk<\/a>.<\/p>\n<p>At the end of the consultation period, Elexon will consider all responses and, if required, update the methodology accordingly. The methodology, along with all consultation responses, will be presented to the Imbalance Settlement Group (ISG) meeting next month to request approval of both the methodology and actual LPs and SSPs.<\/p>\n<p>Upon approval, Elexon will publish the actual LPs and SSPs on the website on or before 31 August 2019.&#xA0;<\/p>\n\n","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","inline_featured_image":false},"tags":[],"class_list":["post-125268","consultation","type-consultation","status-publish","hentry","consultation_type-others","consultation_type-operations-and-settlement"],"acf":[],"semantic_search":{"post_id":125268,"title":"P350: Methodology for Load Periods and Sample Settlement Periods Consultation 19 June 2019","link":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/consultation\/p350-methodology-for-load-periods-and-sample-settlement-periods-consultation-19-june-2019\/","categories":["Consultations for all Process, Operational and Credit areas","Consultations on Operations and Settlement"],"tags":[],"content":"\n\n\n\t<div class=\"panel-section panel-content summary\">\n\t\t<h2>Who will this impact?<\/h2>\t\t<p>Modification <a href=\"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/mod-proposal\/p350\/\">P350 &#x2018;Introduction of a seasonal Zonal Transmission Losses scheme&#x2019;<\/a> introduced a Transmission Loss Factor (TLF) for each TLF Zone and BSC Season, so transmission losses can be allocated on a geographical basis. P350 went live on 1 April 2018.<\/p>\n<p>This Consultation details the proposed methodology for setting Load Periods and Sample Settlement Periods to be used in the derivation of Zonal TLFs, as required by the Balancing and Settlement Code (BSC).<\/p>\n<h2 id=\"outcome\">Outcome<\/h2>\n<p>No responses were in disagreement with using the suggest methodology to calculate the Load Periods (LPs) and Sample Settlement Periods (SSPs). The methodology, and the new LPs and SSPs for BSC Year 2020\/21, were presented to the Imbalance Settlement Group (ISG) in July 2019. These were approved by the ISG and were published on the <a href=\"www.elexonportal.co.uk\/tlfdetermination\">TLF Determination<\/a> page of the Elexon Portal. &#xA0;<\/p>\n\n\t<\/div>\n\n\n\n","s3_url":""},"_links":{"self":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/125268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation"}],"about":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/types\/consultation"}],"version-history":[{"count":0,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/consultation\/125268\/revisions"}],"wp:attachment":[{"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/media?parent=125268"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elexon-beta.elexonhostings.co.uk\/bsc\/wp-json\/wp\/v2\/tags?post=125268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}